X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354082602030

Well Details

Well ID: 0354082602030
Loading map...
Location: 03/02-26-035-08W4/0
Location Alias: 03/02-26-35-08 W4M
Location Alias 2: 03/02-26-035-08 W4/00
Province: Alberta
County/Municipality: Special Area No. 4
Well Name: KARVE 103 HZ PROVOST 2-26-35-8
Operator Name: Karve Energy Inc.
License Number: 0489981
License Date: 2018-07-12
License Status: Issued
Spud Date: 2018-07-30
Final Drill Date: 2018-07-31
Well Total Depth: 1659 m
Surface Hole Latitude: 52.028252
Surface Hole Longitude: -111.02763

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
30 Jul 2018 Ensign Drilling Inc. 348 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-07-31 596
2018-07-31 993 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-21 Multi-Stage Fracture 1623.2 1623.3 0
2018-08-21 Multi-Stage Fracture 1588.7 1588.8 0
2018-08-22 Multi-Stage Fracture 1554 1554.1 0
2018-08-22 Multi-Stage Fracture 1518.9 1519 0
2018-08-22 Multi-Stage Fracture 1483.9 1484 0
2018-08-22 Multi-Stage Fracture 1460.2 1460.3 0
2018-08-22 Multi-Stage Fracture 1436.5 1436.6 0
2018-08-22 Multi-Stage Fracture 1401.3 1401.4 0
2018-08-22 Multi-Stage Fracture 1332 1332.1 0
2018-08-22 Multi-Stage Fracture 1285.3 1285.4 0
2018-08-22 Multi-Stage Fracture 1261.6 1261.7 0
2018-08-22 Multi-Stage Fracture 1226.5 1226.6 0
2018-08-22 Multi-Stage Fracture 1191.5 1191.6 0
2018-08-22 Multi-Stage Fracture 1156.8 1156.9 0
2018-08-22 Multi-Stage Fracture 1133.1 1133.2 0
2018-08-22 Multi-Stage Fracture 1109.4 1109.5 0
2018-08-22 Multi-Stage Fracture 1085.7 1085.8 0
2018-08-22 Multi-Stage Fracture 1062 1062.1 0
2018-08-22 Multi-Stage Fracture 1038.3 1038.4 0
2018-08-22 Multi-Stage Fracture 1014.7 1014.8 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
08/21/2018 08/22/2018 Methyl Alcohol 67-56-1 Bactericide/Biocide 0.0112 Step Energy Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
8/16/2018 8/16/2018 0:00 Central Water Distribution Facility 104
8/16/2018 8/16/2018 0:00 Municipal Water 347

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2805 80.9 0.0 2099.5
2019 2159 37.2 0.0 784.5

For data sources see[8]

References