X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354082412030

Well Details

Well ID: 0354082412030
Loading map...
Location: 03/12-24-035-08W4/0
Location Alias: 03/12-24-35-08 W4M
Location Alias 2: 03/12-24-035-08 W4/00
Province: Alberta
County/Municipality: Special Area No. 4
Well Name: KARVE 103 HZ PROVOST 12-24-35-8
Operator Name: Karve Energy Inc.
License Number: 0489982
License Date: 2018-07-12
License Status: Amended
Spud Date: 2018-08-06
Final Drill Date: 2018-08-08
Well Total Depth: 1722 m
Surface Hole Latitude: 52.028251
Surface Hole Longitude: -111.026975

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
07 Aug 2018 Ensign Drilling Inc. 348 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-08-07 534
2018-08-07 1053 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-23 Multi-Stage Fracture 1685.4 1685.5 0
2018-08-23 Multi-Stage Fracture 1650.4 1650.5 0
2018-08-23 Multi-Stage Fracture 1615.2 1615.3 0
2018-08-23 Multi-Stage Fracture 1580.2 1580.3 0
2018-08-23 Multi-Stage Fracture 1544.9 1545 0
2018-08-23 Multi-Stage Fracture 1510.1 1510.2 0
2018-08-23 Multi-Stage Fracture 1475.1 1475.2 0
2018-08-23 Multi-Stage Fracture 1439.9 1440 0
2018-08-23 Multi-Stage Fracture 1404.9 1405 0
2018-08-23 Multi-Stage Fracture 1370 1370.1 0
2018-08-23 Multi-Stage Fracture 1346.3 1346.4 0
2018-08-23 Multi-Stage Fracture 1322.8 1322.9 0
2018-08-23 Multi-Stage Fracture 1299.5 1299.6 0
2018-08-23 Multi-Stage Fracture 1275.8 1275.9 0
2018-08-23 Multi-Stage Fracture 1252.3 1252.4 0
2018-08-24 Multi-Stage Fracture 1228.7 1228.8 0
2018-08-24 Multi-Stage Fracture 1205 1205.1 0
2018-08-24 Multi-Stage Fracture 1181.5 1181.6 0
2018-08-24 Multi-Stage Fracture 1157.9 1158 0
2018-08-24 Multi-Stage Fracture 1134.5 1134.6 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
08/23/2018 08/24/2018 Methyl Alcohol 67-56-1 Bactericide/Biocide 0.0106 Step Energy Services

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
8/16/2018 8/16/2018 0:00 Central Water Distribution Facility 104
8/16/2018 8/16/2018 0:00 Municipal Water 347

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2773 78.2 0.0 1722.1
2019 2159 96.4 0.0 1005.0

For data sources see[8]

References