X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354080605000

Well Details

Well ID: 0354080605000
Loading map...
Location: 00/05-06-035-08W4/0
Location Alias: 00/05-06-35-08 W4M
Location Alias 2: 00/05-06-035-08 W4/00
Province: Alberta
County/Municipality: Special Area No. 4
Well Name: TAC 11-31 HZ PROVOST 5-6-35-8
Operator Name: Tamarack Acquisition Corp.
License Number: 0489437
License Date: 2018-06-04
License Status: Issued
Spud Date: 2018-06-30
Final Drill Date: 2018-07-21
Well Total Depth: 2186 m
Surface Hole Latitude: 51.964158
Surface Hole Longitude: -111.132581

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
21 Jul 2018 Tempco Drilling Company Inc. 5 N/A Drill To LD
30 Jun 2018 Predator Drilling Inc. 27 N/A Set Surface

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-07-21 195
2018-07-21 1002 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-28 Perforation 2164 2164.5 20
2018-07-28 Perforation 2126 2126.5 20
2018-07-28 Perforation 2092 2092.5 20
2018-07-28 Perforation 2057 2057.5 20
2018-07-28 Perforation 2032 2032.5 20
2018-07-28 Perforation 1987 1987.5 20
2018-07-28 Perforation 1963 1963.5 20
2018-07-28 Perforation 1916 1916.5 20
2018-07-28 Perforation 1859 1859.5 20
2018-07-28 Perforation 1825 1825.5 20
2018-07-28 Perforation 1790 1790.5 20
2018-07-28 Perforation 1756 1756.5 20
2018-07-28 Perforation 1721 1721.5 20
2018-07-28 Perforation 1686 1686.5 20
2018-07-28 Perforation 1651 1651.5 20
2018-07-28 Perforation 1625 1625.5 20
2018-07-28 Perforation 1590 1590.5 20
2018-07-28 Perforation 1555 1555.5 20
2018-07-28 Perforation 1520 1520.5 20
2018-07-28 Perforation 1485 1485.5 20
2018-07-28 Perforation 1450 1450.5 20
2018-07-28 Perforation 1415 1415.5 20
2018-07-28 Perforation 1380 1380.5 20
2018-07-28 Perforation 1345 1345.5 20
2018-07-28 Perforation 1310 1310.5 20
2018-07-28 Perforation 1275 1275.5 20
2018-07-28 Perforation 1240 1240.5 20
2018-07-28 Perforation 1206 1206.5 20
2018-07-28 Perforation 1171 1171.5 20
2018-07-28 Perforation 1136 1136.5 20
2018-07-28 Perforation 1101 1101.5 20
2018-07-28 Perforation 1066 1066.5 20
2018-07-28 Perforation 1030 1030.5 20
2018-07-28 Perforation 999 999.5 20
2018-08-03 Fracture 2164 2164.5 0
2018-08-03 Fracture 2126 2126.5 0
2018-08-03 Fracture 2092 2092.5 0
2018-08-03 Fracture 2057 2057.5 0
2018-08-03 Fracture 2032 2032.5 0
2018-08-03 Fracture 1987 1987.5 0
2018-08-03 Fracture 1963 1963.5 0
2018-08-03 Fracture 1916 1916.5 0
2018-08-03 Fracture 1859 1859.5 0
2018-08-03 Fracture 1825 1825.5 0
2018-08-03 Fracture 1790 1790.5 0
2018-08-03 Fracture 1756 1756.5 0
2018-08-03 Fracture 1721 1721.5 0
2018-08-03 Fracture 1686 1686.5 0
2018-08-03 Fracture 1651 1651.5 0
2018-08-03 Fracture 1625 1625.5 0
2018-08-03 Fracture 1590 1590.5 0
2018-08-03 Fracture 1555 1555.5 0
2018-08-03 Fracture 1520 1520.5 0
2018-08-03 Fracture 1485 1485.5 0
2018-08-03 Fracture 1450 1450.5 0
2018-08-03 Fracture 1415 1415.5 0
2018-08-03 Fracture 1380 1380.5 0
2018-08-03 Fracture 1345 1345.5 0
2018-08-03 Fracture 1310 1310.5 0
2018-08-03 Fracture 1275 1275.5 0
2018-08-03 Fracture 1240 1240.5 0
2018-08-03 Fracture 1206 1206.5 0
2018-08-03 Fracture 1171 1171.5 0
2018-08-03 Fracture 1136 1136.5 0
2018-08-03 Fracture 1101 1101.5 0
2018-08-03 Fracture 1066 1066.5 0
2018-08-03 Fracture 1030 1030.5 0
2018-08-03 Fracture 999 999.5 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
08/03/2018 08/03/2018 Potassium Hydroxide 1310-58-3 Crosslinker 0.1347 Fusion Technologies Inc.

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
7/13/2018 7/21/2018 0:00 Oilfield Produced Water 746

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 3031 468.5 0.0 0.0
2019 2019 314.4 0.0 114.3

For data sources see[8]

References