X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505183302000

Well Details

Well ID: 0505183302000
Loading map...
Location: 00/02-33-050-18W5/0
Location Alias: 00/02-33-50-18 W5M
Location Alias 2: 00/02-33-050-18 W5/00
Province: Alberta
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ ANSELL 2-33-50-18
Operator Name: Tourmaline Oil Corp.
License Number: 0470588
License Date: 2014-10-10
License Status: Issued
Spud Date: 2014-12-08
Final Drill Date: 2015-01-04
Well Total Depth: 4583 m
Surface Hole Latitude: 53.365723
Surface Hole Longitude: -116.589907

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
07 Dec 2014 Savanna Drilling Corp. 653 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-12-10 727
2014-12-14 2516
2014-12-30 2950 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-01-05 Open Hole/Barefoot Completion 4566 4583 0
2015-01-12 Multi-Stage Fracture 4544.9 4545 0
2015-01-12 Multi-Stage Fracture 4431.7 4431.8 0
2015-01-12 Multi-Stage Fracture 4335.8 4335.9 0
2015-01-12 Multi-Stage Fracture 4252.1 4252.2 0
2015-01-12 Multi-Stage Fracture 4156.4 4156.5 0
2015-01-12 Multi-Stage Fracture 4072.4 4072.5 0
2015-01-12 Multi-Stage Fracture 3976.6 3976.7 0
2015-01-12 Multi-Stage Fracture 3892 3892.1 0
2015-01-12 Multi-Stage Fracture 3796 3796.1 0
2015-01-12 Multi-Stage Fracture 3711.5 3711.6 0
2015-01-12 Multi-Stage Fracture 3615.7 3615.8 0
2015-01-12 Multi-Stage Fracture 3532.2 3532.3 0
2015-01-12 Multi-Stage Fracture 3437.1 3437.2 0
2015-01-12 Multi-Stage Fracture 3353.5 3353.6 0
2015-01-12 Multi-Stage Fracture 3258.2 3258.3 0
2015-01-12 Multi-Stage Fracture 3174 3174.1 0
2015-01-12 Multi-Stage Fracture 3078.4 3078.5 0
2015-01-12 Multi-Stage Fracture 2994.6 2994.7 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
01/12/2015 01/12/2015 Isoparaffinic Solvent 64742-47-8 Friction Reducer 0.0822 Sanjel
Crystalline Silica 14808-60-7 1.2293 Sanjel
Crystalline Silica 14808-60-7 1.2293 Sanjel
BNPD 52-51-7 Bactericide/Biocide 0.0082 Sanjel
Methyl Alcohol 67-56-1 Bactericide/Biocide 0.0082 Sanjel
1.6-Hexanediamine dihydrochloride 6055-52-3 Clay Control 0.1648 Sanjel
Non-Hazardous Ingredients Not Available Clay Control 0.1648 Sanjel
Isoparaffinic Solvent 64742-47-8 Friction Reducer 0.0822 Sanjel
Non-Hazardous Ingredients Not Available Friction Reducer 0.0822 Sanjel
Surfactant 68131-40-8 Friction Reducer 0.0822 Sanjel

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
12/18/2014 12/21/2014 0:00 Groundwater - Non-saline less than or equal to 150m deep 590

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 7639 31138.8 0.0 0.0
2016 8763 17369.3 0.0 0.0
2017 8412 10163.3 0.0 369.6
2018 8168 6919.2 0.0 866.6
2019 2071 1624.4 0.0 140.3

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-01-06 No Incident N/A N/A
2015-01-14 No Incident N/A N/A

For data sources see[9]

References