If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494013401C00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.2662,"lon":-110.058965,"icon":""}]} |
Location: C0/01-34-049-01W4/0 | |
Location Alias: C0/01-34-49-01 W4M | |
Location Alias 2: C0/01-34-049-01 W4/00 | |
Province: Alberta | |
County/Municipality: County of Vermilion River | |
Well Name: MURPHY LLOYD 1C-34-49-1 | |
Operator Name: | |
License Number: 0003544 | |
License Date: 1951-09-27 | |
License Status: RecCertified | |
Spud Date: 1951-10-17 | |
Final Drill Date: 1951-10-21 | |
Well Total Depth: 600.5 m | |
Surface Hole Latitude: 53.2662 | |
Surface Hole Longitude: -110.058965 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-11-20 | Bullet Perforation | 592.8 | 594.1 | 13 |
1952-03-09 | Cement Squeeze | 592.8 | 594.1 | 0 |
1952-03-13 | Bullet Perforation | 596.2 | 597.4 | 13 |
1957-05-08 | Bullet Perforation | 584 | 585.8 | 13 |
1957-05-10 | Cement Plug | 588.3 | 589.5 | 0 |
1977-07-11 | Packing Device Capped w/Cement | 576.1 | 576.1 | 0 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 701.0 | 0.0 | 1076.0 |
1962 | 0 | 26.3 | 0.0 | 142.3 |
1963 | 0 | 5.4 | 0.0 | 187.0 |
1964 | 0 | 102.9 | 0.0 | 436.2 |
1976 | 4128 | 1.7 | 0.0 | 772.8 |
1977 | 2064 | 3.7 | 0.0 | 554.4 |
For data sources see[4]