If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485110209000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.116414,"lon":-115.515727,"icon":""}]} |
Location: 00/09-02-048-11W5/0 | |
Location Alias: 00/09-02-48-11 W5M | |
Location Alias 2: 00/09-02-048-11 W5/00 | |
Province: Alberta | |
County/Municipality: Brazeau County | |
Well Name: RIDGEBACK HZ PEMBINA 9-2-48-11 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0487607 | |
License Date: 2018-01-10 | |
License Status: Issued | |
Spud Date: 2018-02-08 | |
Final Drill Date: 2018-02-14 | |
Well Total Depth: 3457 m | |
Surface Hole Latitude: 53.116414 | |
Surface Hole Longitude: -115.515727 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
08 Feb 2018 | Precision Drilling Corporation | 183 | N/A | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-11 | 1637 | |
2018-02-11 | 1964 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-02-15 | Open Hole/Barefoot Completion | 3452 | 3457 | 0 |
2018-03-06 | Multi-Stage Fracture | 3430 | 3430.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 3394 | 3394.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 3358 | 3358.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 3322 | 3322.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 3286 | 3286.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 3250 | 3250.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 3214 | 3214.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 3178 | 3178.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 3142 | 3142.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 3106 | 3106.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 3070 | 3070.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 3034 | 3034.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 2998 | 2998.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 2962 | 2962.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 2926 | 2926.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 2890 | 2890.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 2854 | 2854.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 2818 | 2818.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 2782 | 2782.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 2746 | 2746.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 2710 | 2710.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 2674 | 2674.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 2638 | 2638.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 2602 | 2602.1 | 0 |
2018-03-06 | Multi-Stage Fracture | 2566 | 2566.1 | 0 |
2018-03-07 | Multi-Stage Fracture | 2530 | 2530.1 | 0 |
2018-03-07 | Multi-Stage Fracture | 2494 | 2494.1 | 0 |
2018-03-07 | Multi-Stage Fracture | 2458 | 2458.1 | 0 |
2018-03-07 | Multi-Stage Fracture | 2422 | 2422.1 | 0 |
2018-03-07 | Multi-Stage Fracture | 2386 | 2386.1 | 0 |
2018-03-07 | Multi-Stage Fracture | 2350 | 2350.1 | 0 |
2018-03-07 | Multi-Stage Fracture | 2314 | 2314.1 | 0 |
2018-03-07 | Multi-Stage Fracture | 2278 | 2278.1 | 0 |
2018-03-07 | Multi-Stage Fracture | 2242 | 2242.1 | 0 |
2018-03-07 | Multi-Stage Fracture | 2206 | 2206.1 | 0 |
2018-03-07 | Multi-Stage Fracture | 2170 | 2170.1 | 0 |
2018-03-07 | Multi-Stage Fracture | 2134 | 2134.1 | 0 |
2018-03-07 | Multi-Stage Fracture | 2098 | 2098.1 | 0 |
2018-03-07 | Multi-Stage Fracture | 2062 | 2062.1 | 0 |
2018-03-07 | Multi-Stage Fracture | 2015 | 2015.1 | 0 |
For data sources see[5]
Start Date | End Date | Chemical Name | CAS Number | Purpose | Job Percentage | Supplier |
---|---|---|---|---|---|---|
03/06/2018 | 03/07/2018 | Methanol | 67-56-1 | Surfactant | 0.0955 | Element |
2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | Bactericide/Biocide | 0.0092 | Element |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
3/4/2018 0 | 3/5/2018 0:00 | Surface Water - Lake | 3363 |
2/28/2018 | 3/2/2018 0:00 | Surface Water - Runoff | 2990 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 6635 | 908.5 | 0.0 | 0.0 |
2019 | 2155 | 354.5 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-15 | No Incident | N/A | N/A |
2018-03-14 | No Incident | N/A | N/A |
For data sources see[9]