If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-26363 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.454371,"lon":-79.41536,"icon":""}]} |
Operator Name: XTO ENERGY INC | |
First Permit Date: 2006-07-03 | |
Last Permit Date: 2006-07-03 | |
Spud Date: 2006-09-08 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.454371 | |
Longitude: -79.41536 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 3793.0 | 365.0 | 0.0 | 0.0 | 21.51 | 365.0 |
2012-0 | 4283.0 | 366.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 4878.0 | 352.0 | 0.0 | 0.0 | 51.0 | 352.0 |
2010-0 | 6187.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 4532.0 | 365.0 | 0.0 | 0.0 | 59.0 | 365.0 |
2008-0 | 7550.0 | 366.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2007-0 | 4961.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2006-0 | 1915.0 | 62.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2008-0 | BRINE | 20.0 | Bbl | BRINE OR INDUSTRIAL WASTE TREATMENT PLT | PA BRINE TRT - FRANKLIN PLT | |||
2010-0 | PRODUCED FLUID | 7.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAR000519462 | ADVANCED WASTE SERVICES OF PA (NEW CASTLE) | NEW CASTLE | PA |
2010-0 | PRODUCED FLUID | 1.0 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 | CLEARFIELD MUNICIPAL SEWAGE TREATMENT PLANT | CLEARFIELD | PA |
2010-0 | PRODUCED FLUID | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2010-0 | PRODUCED FLUID | 1.0 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 | JOHNSTOWN SEWAGE TREATMENT PLANT | JOHNSTOWN | PA |
2010-0 | PRODUCED FLUID | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2010-0 | PRODUCED FLUID | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 | PUNXSUTAWNEY BORO STP | PUNXSUTAWNEY | PA |
2010-0 | PRODUCED FLUID | 1.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2011-0 | PRODUCED FLUID | 9.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAR000519462 | ADVANCED WASTE SERVICES OF PA (NEW CASTLE) | NEW CASTLE | PA |
2011-0 | PRODUCED FLUID | 9.0 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 | CLEARFIELD MUNICIPAL SEWAGE TREATMENT PLANT | CLEARFIELD | PA |
2011-0 | PRODUCED FLUID | 8.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | HART RESOURCE TECHNOLOGIES, INC. - CREEKSIDE | CREEKSIDE | PA |
2011-0 | PRODUCED FLUID | 24.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2013-0 | PRODUCED FLUID | 41.0 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 | PUNXSUTAWNEY BORO SEWAGE TREATMENT PLANT | PUNXSUTAWNEY | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1840496 | 2009-10-21 | No Violations Noted | Well site is equipped for production. Brine Tank located on-site is in sound condition. There is no evidence of accelerated erosion or sedimentation on the access road or well site. The vegetation is well established. The operator should continue to monitor the site for erosion and sedimentation.
Note- The Brine Tank is almost full (80-90%) and should be emptied soon to avoid a spill. |