{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.543051,"lon":-79.407867,"icon":""}]} |
| Operator Name: ACTAGON CORP | |
| First Permit Date: 2009-04-06 | |
| Last Permit Date: 2009-04-06 | |
| Spud Date: 2009-04-24 | |
| Unconventional: No | |
| Horizontal: No | |
| Violations: 1 | |
| Latitude: 40.543051 | |
| Longitude: -79.407867 |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|---|---|---|---|---|---|
| 2013-0 | 1851.0 | 335.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2011-0 | 3136.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2010-0 | 4869.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2009-0 | 40.0 | 30.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|---|---|---|---|---|---|---|---|
| 2009-0 | FRACING FLUID WASTE | 267.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
| 2011-0 | PRODUCED FLUID | 50.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
|---|---|---|---|---|
| 1796671 | 2009-05-06 | Pending | Site ID sign in place. E&S plan on site. Well being drilled at time of inspection.
Silt fence installed along down-slope side of site adequately maintained. Site is stabilized with rock. No signs of accelerated erosion on site. Access road ok. Pit appears sound and had adequate freeboard..
roads, other connected wells included in this project, etc.. Follow-up inspections will be conducted to determine the amount of total disturbance, and to determine if the sites are in violation. Culvert installed on access road requires rip-rap at the outlet to minimize erosion. Please address this concern and contact this office upon completion. |
|
| 1797920 | 2009-05-05 | No Violations Noted | Drilling @ 2310ft/ID&pit ok/E&S ok | |
| 1798023 | 2009-05-14 | Violation(s) Noted | Site ID sign in place. E&S plan on site. Well not equipped for production (well head only on site).
Silt fence installed along down-slope side of site adequately maintained. Pit appears sound and had adequate freeboard Site is stabilized with rock. No signs of accelerated erosion on site. Access road ok. Inspection revealed the following deficiencies: 1) Failure to obtain ESCGP-1 permit. When the total amount of earth disturbance activity results in 5 acres or greater of substantially
connected earth disturbance at one time or 5 or more acres of earth will be disturbed over the life of the project the operator must obtain
an ESCGP-1 approval before conducting any earth disturbance activities. The total disturbance for your project was approx. 15.08 acres. In addittion to the ESCGP-1 permit that needs to be submitted and approved for the Auen well project as stated above, the culvert installed on the access road to this site requires rip-rap at the outlet to minimize erosion. Please address this concern and contact me.
|
562929 |