If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24567 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.37180588,"lon":-82.21815769,"icon":""}]} |
County: Knox | |
Municipality: | |
Operator Name: UNITY PETROLEUM | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-07-30 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.37180588 | |
Longitude: -82.21815769 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 597.0 | 371.0 | ||||
2013-0 | 956.0 | 455.0 | ||||
2014-0 | 820.0 | 365.0 | 340.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1085212227 | 2013-05-09 | This well is in production. | ||||
1216257182 | 2012-08-06 | I witnessed the cementing of the surface casing today for Unity Petroleum. John Knight with Unity Petroleum was on location. Kenny Rich was contracted to drill this well with his cable tool rig for Unity Petroleum. Good returns were observed. Cement did not stay at the surface. Cement will be drilled out, bailed and dumped on the backside. | ||||
-1218556750 | 2012-09-04 | Kenny Rich drilling during inspection. Depth approximately 2815 feet. | ||||
-1338154218 | 2012-08-24 | I inspected this drilling location today. Kenny Rich was drilling during inspection. Depth was 2,360 feet. | ||||
-1371027753 | 2012-08-16 | Kenny Rich drilling during inspection. Depth at the time of inspection was approximately 1,650 feet. | ||||
-1796085084 | 2012-08-01 | Today I inspected this drilling location. Kenny Rich was drilling during inspection. No violations observed. |
For data sources see[2]