34-115-24670

Well Details

Well ID: 34-115-24670
Loading map...
County: Morgan
Municipality:
Operator Name: NGO DEVELOPMENT CORP.
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2012-10-01
Unconventional: No
Configuration: Vertical
Well Status: Producing
Violations: 0
Latitude: 39.74412944
Longitude: -81.90770132

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 0.0 241.0
2014-0 0.0 365.0 424.0 365.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1047811803 2012-10-25 Warren rig 7 is plugging back from roserun sandstone to 200'below the clinton sandstone. Formation is placing the plugs. Bottom plug is at 6338-6138. The point pleasant/utica plug is at 5745-5545'. The Buffer plug below the clinton is at 4996-4796'. The well will be sold to NGO.
128310938 2013-04-30 Location does not meet preliminary restoration. Access road was completely muddy due to recent rain so I will return when area is more accessible for vehicles.
1350488898 2012-10-17 I arrived on location and Artex was currently drilling after changing to a PDC bit. They had finished drilling through the Clinton last night and are now drilling through the Queenston. Depth at this time is ~4460' and the ROP is around 5-8 min/foot. Stratigraph muddlogers are on site.
2012187468 2012-10-09 Jake Glascock and I stopped in to check Warren Drilling rig. They are setting cement plugs to heal a Theif zone at the gray shale in the Ohio Shale. Artex is pin pointing where the lost circulation zone is so they can case off in the wells in the future.
-431134910 2012-10-02 On 10-1-12 Formation Cementing cemented 11.75conductor pipe in to 100'. I was out witnessing the pressure test since I missed the conductor job. The test passed 300psi for 15 minutes.
437848927 2014-09-30 Site now correctly meets 1509.072 preliminary requirements.
-903125184 2012-10-04 Artex is setting surface pipe and Warren rig 7 is placing pipe. Universal is on location to cement pipe in place. There is 1636'of 11open hole. There is 1574 of 8.625casing @24lb/ft. Baffle is set at 1531'. As plug was landed at 550psi the company took pressure up to 1000 psi for 15 min.and bled back to lift pressure which is at 550psi.
-909179358 2012-10-24 Stopped in at Warren rig 7 and talked with Artex on plug placement. Will call when pipe on bottom to set plugs.

For data sources see[2]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20. 
  2. "Ohio Department of Natural Resources RBDMS". [2]. 2015-06-19. Retrieved 2015-06-20.