If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24322 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.66083539,"lon":-81.20019424,"icon":""}]} |
County: Monroe | |
Municipality: | |
Operator Name: HG ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-04-03 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.66083539 | |
Longitude: -81.20019424 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-12 | 188484.0 | 0.0 | ||||
2014-1 | 508312.0 | 90.0 | 0.0 | 90.0 | ||
2014-2 | 268337.0 | 91.0 | 0.0 | 91.0 | ||
2014-3 | 252072.0 | 92.0 | 0.0 | 92.0 | ||
2014-4 | 184162.0 | 80.0 | 0.0 | 80.0 | ||
2015-1 | 132473.0 | 85.0 | 0.0 | 85.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1361818720 | 2013-02-25 | Status check inspection found the current drilling depth to be 1359' using a 12.250 drill bit. The company is currently doing a borehole deviation survey. | ||||
1362080950 | 2013-02-28 | Status update inspection to check on the current drilling status found the current drilling depth to be 3721' using a 12.250 hammer bit drilling on air. | ||||
1362416554 | 2013-03-04 | Status check inspection on the current drilling progress found the current well bore section to be complete with a total depth reached of 8366' using a 12.250 bit drilled on air. The company is preparing to load the hole with fluid and trip out of the hole with the drill string to prepare to run the 9.625 casing string. Inspector will note that all casing permit conditions are being followed. | ||||
1365620583 | 2013-04-10 | Inspection and status update on the current drilling progress found the current drilling depth to be 12,528' in the horizontal section. | ||||
1373500691 | 2013-07-10 | On site inspection and status check found a service rig on the hole running in with tubing preparing to drill out the frack plugs. I reviewed the flow back procedures and methods of storing well bore produced fluid in the temporally set 500 barrel tanks on site, along with the use of non-explosion proof pumps in the transfer of produced product. The company has broken no Ohio laws we are merely reviewing all procedures in the completion process. Ron Trivisanno and Blake Arthur from the Divisions Engineering section was with me on site. | ||||
-15022911 | 2013-02-22 | Status update inspection to document that Dallas Morris rig 24 has moved onto the hole to drill and set the 9.625 intermediate string on this day. I was on site and did receive company records from the Conductor and Surface jobs indicating size and length of pipe as well as the dates the casing was set, no records were found recorded in the database, company man indicated that the jobs were witnessed by a inspector. | ||||
-1527945231 | 2013-12-11 | The well drilling and stimulation process has been completed and the company is hooking up the completion testing equipment with the well being in production within 24 hours. | ||||
2092540780 | 2013-07-29 | The company is currently in the process of hooking up the production flow lines on the said well along with the remaining wells on the drill pad. I discussed with the company representatives on site the need to clean up the contaminated material from around the well heads. | ||||
2144437239 | 2013-10-07 | Preliminary Restoration found the wells on site all have been drilled and stimulated and the production equipment in place awaiting the gas processing transporting facility to begin purchasing the product. 6- 210 barrel storage tanks are on site in 2 tank individual containment areas, Proper well head identification is in place along with identification at the well site entry point. The site meets ORC 1509.072 regarding restoration. | ||||
-309523253 | 2013-05-13 | Status check inspection of the stimulation process found Producers Services on location stimulating the well, A completion plug was set @ 14,714 with the well perferated between 14,655' and 14,414' with 60 perforations. Multiple wells are being completed simultaneously on this pad. |
For data sources see[2]