X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-27114

Well Details

Well ID: 37-129-27114
Loading map...
Operator Name: PATRIOT EXPLORATION CORP
First Permit Date: 2007-09-19
Last Permit Date: 2007-09-19
Spud Date: 2007-12-27
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.620851
Longitude: -79.679587

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 4013.0 365.0 0.0 0.0 0.0 0.0
2012-0 4114.0 365.0 0.0 0.0 0.0 0.0
2011-0 4325.0 365.0 0.0 0.0 0.0 0.0
2010-0 3544.0 365.0 0.0 0.0 0.0 0.0
2009-0 4506.0 363.0 0.0 0.0 0.0 0.0
2008-0 3640.0 258.0 0.0 0.0 0.0 0.0
2007-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2008-0 BRINE 650.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT ALLEGHENY VALLEY JT SEW AUTH
2008-0 FRACKING FLUID 1220.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT ALLEGHENY VALLEY JT SEW AUTH
2008-0 BRINE 650.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2010-0 PRODUCED FLUID 25.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346 PUNXSUTAWNEY BORO STP PUNXSUTAWNEY PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1689374 2008-01-02 No Violations Noted SPUD 12/26/07 - PIT/FREEBAORD AND E/S CONTROL OK
1808719 2009-06-24 No Violations Noted Skid Rig- ReDrilled. The monument for the plug of 21-1 was located. There are no signs of erosion or sedimentation. The vegetation is established. The site has been properly restored.
1808728 2009-06-24 No Violations Noted Well site was re-drilled. Well appears to be in production. Brine Tank located on-site is in sound condition. There is no evidence of accelerated erosion or sedimentation on the access road or well site. The vegetation is firmly established. The operator should continue to monitor the site for erosion and sedimentation.

References