Well Details

Well ID: 34-067-21369
Loading map...
County: Harrison
Municipality:
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-10-05
Unconventional:
Configuration:
Well Status: Well Drilled
Violations: 0
Latitude: 40.37191381
Longitude: -81.04320195

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
-1075193312 2014-12-12 I was on location to witness the cementing of the 5.5 production casing. Nomac Rig #73 drilled the lateral to a total measured depth of 19,901' and Wyoming casing landed the 5.5 production casing at the bottom of the hole. Nomac 73 circulated an entire hole volume and O-Tex rigged up to the Black Hawk cement head and pressure tested the lines. They then mixed and pumped a 50 barrel, 12.0lb/gal Barite spacer and followed that with 283 barrels of lead cement and 593 barrels of tail cement. O-Tex released the plug and displaced the plug to the collar with 440 barrels of water. The plug landed at 3100psi and the pressure was increased and held at 3600psi for five minutes. The pressure was released and the floats held with 4.5 barrels flowing back to the truck. 50 barrels of Barite spacer circulated to surface putting the top of the scavenger cement near surface. See casing ticket for more details on this job. No violations.
1412602227 2014-10-06 I an on site today to witness the running and the cementing of the 20 inch diameter casing string. Top Hole Drilling drilled a 26 inch diameter hole to 120 ft. and set 120 ft. of 94.5 lb. casing. Express Cementing Service cemented with 230 sacks of class A cement at 15.6 lb. and a yield of 1.20 then had 14 bbls of good cement return.
1425478868 2014-12-08 I was on location to check the drilling status of Nomac #73. They drilled the 8.75 vertical section to the mud up point of 7497' and are currently drilling the 8.5 lateral at a total measured depth of 17,197'. They currently have a 15'-20' flare burning from the flare stack and should reach a total depth of 19,901' in several days. The location is in good condition and all equipment is on containment. No violations.
-1458439110 2014-12-01 I was on location to check the drilling status of Nomac Rig #73. The rig has reached the mud-up-point of 7497', has loaded the hole, and is currently tripping out the drill pipe and 8.75 bit assembly. They will pick up the 8.5 bottom hole assembly to drill the curve and lateral. The location is in good condition and all drilling equipment is on containment. No violations.
-1602073800 2014-10-06 Check on Patterson Drilling Rig # 257 and found that they are rigging up and should be ready to drill tonight or in the morning.

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.