If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23084 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.26113045,"lon":-81.59449911,"icon":""}]} |
County: Summit | |
Municipality: | |
Operator Name: GONZOIL INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2009-08-05 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Dry and Abandoned | |
Violations: 0 | |
Latitude: 41.26113045 | |
Longitude: -81.59449911 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1029124081 | 2010-05-27 | Bishop Well Service was on site to pull rods and tubing. The well is scheduled to be plugged and abandoned starting tomorrow. | ||||
-1101749203 | 2009-08-18 | The well has been fraced and Bishop Well Service is on site to complete the well. The drilling pits have been solidified and covered over. | ||||
1145648733 | 2011-02-01 | The well has been plugged and abandoned after being completed. Preliminary restoration is approved with this report and final restoration will be approved after receiving the landowner waiver for the lease road and entrance. | ||||
129846181 | 2009-11-10 | The tank battery is set and fenced off and the well is fenced. The affected areas have been graded, seeded and mulched. Preliminary restoration will be approved as soon as the grass has established. | ||||
1732274649 | 2010-04-20 | This preliminary restoration status inspection found that the affected areas need some additional seed. A call to GonzOil to discuss restoration instead indicated that the company intends to plug and abandon the well as non-commercial. If that is the case then preliminary restoration will be approved prior to plugging. | ||||
-1853222691 | 2009-09-03 | The well has been fraced and the tank battery is being assembled. The site has been rough graded and the drilling pits have been solidified and covered. No violations at this time. | ||||
-2100303128 | 2009-08-04 | The location has been built and the rig is on site. Wildcat will bring the rest of the equipment over and spud the well on 8/5. | ||||
531850198 | 2010-06-23 | The production equipment remains on site. GonzOil has until the end of November to complete final restoration. | ||||
-704466960 | 2009-08-13 | Daily's Excavating and ChemTech were on site to solidify the drilling pits. | ||||
-868174709 | 2009-07-15 | The drilling location has been built and waiting for the drilling rig. The ID and permit are posted. |
For data sources see[1]