{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.56064612,"lon":-81.9232747,"icon":""}]} |
County: Holmes | |
Municipality: | |
Operator Name: BANDS CO INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-04-09 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.56064612 | |
Longitude: -81.9232747 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 42308.0 | 517.0 | ||||
2014-0 | 111328.0 | 365.0 | 1622.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1122020913 | 2013-04-11 | An intermediate string of 1008' of 8-5/8 casing was set and cemented this date. See the casing ticket for details. | ||||
-1122020913 | 2013-04-11 | An intermediate string of 1008' of 8-5/8 casing was set and cemented this date. See the casing ticket for details. | ||||
1201063436 | 2013-06-11 | Baker Hughes ran a cement bond log and found the top of the cement at 4904'. The top perforation is at 5435' so the 500' cement requirement is met. Baker Hughes perforated 52 shots from 5435-5540 | ||||
-1218741798 | 2013-06-18 | This is a producing pump jack well. There were no problems noted at the time of the inspection. | ||||
1364553416 | 2013-03-28 | Met with the drilling contractor, operator and the excavation contractor to discuss how the rig would be set up and where the drilling pits would be. | ||||
1365160837 | 2013-04-02 | The location is being cut. | ||||
1365503218 | 2013-04-08 | The drilling rig is being moved on and rigged up. | ||||
1365503218 | 2013-04-08 | The drilling rig is being moved on and rigged up. | ||||
1365591639 | 2013-04-09 | Mix mud and spud. Drilling ahead at 105' on fluid. 102' of drift was encountered. | ||||
1365591639 | 2013-04-09 | Mix mud and spud. Drilling ahead at 105' on fluid. 102' of drift was encountered. | ||||
1366023640 | 2013-04-11 | Drilling ahead at 776' on fluid. Part of the hillside slid into the outer pit tearing the liner. The pit was not in use at the time of the slide. It will be repaired prior to use. | ||||
1366023640 | 2013-04-11 | Drilling ahead at 776' on fluid. Part of the hillside slid into the outer pit tearing the liner. The pit was not in use at the time of the slide. It will be repaired prior to use. | ||||
1366109690 | 2013-04-15 | Drilling ahead at 2601' on fluid. No problems noted at the time of the inspection. | ||||
1366109690 | 2013-04-15 | Drilling ahead at 2601' on fluid. No problems noted at the time of the inspection. | ||||
1366223919 | 2013-04-17 | Drilling ahead at 3402' on fluid in the shale. Mixing potash. | ||||
1366223919 | 2013-04-17 | Drilling ahead at 3402' on fluid in the shale. Mixing potash. | ||||
1366639696 | 2013-04-19 | Drilling ahead at 4134' on fluid in the shale. There were no problems noted at the time of the inspection. | ||||
1366798322 | 2013-04-23 | Just back to drilling after repairing the mud pump. Drilling ahead at 5433 in the Gull River where there was a 300 unit gas show. | ||||
1366890454 | 2013-04-24 | Ran 5589' of 4-1/2 10.5# casing set at 5597'. Universal cemented with 125 sacks of Rose Run Blend. See the casing ticket for the details. | ||||
1367577734 | 2013-04-30 | The 1st working pit was solidified with 1 load of flyash. | ||||
1650037142 | 2013-04-22 | Drilling ahead at 5208 in the Blackriver. No problems noted at the time of the inspeciton. | ||||
1691496555 | 2013-06-12 | Producers acidized this well with 3000 gals of HCL. See the stimulation report for details. | ||||
1697871007 | 2013-04-24 | Reached a total depth of 5595' (driller) 5598' (logger). Running 4-1/2 casing. | ||||
180444004 | 2013-04-12 | The cement stayed up on the intermediate string. A long boomed trackhoe is on location removing the slipped earth from in and around the outer pit. A new reinforced liner is to be installed. | ||||
180444004 | 2013-04-12 | The cement stayed up on the intermediate string. A long boomed trackhoe is on location removing the slipped earth from in and around the outer pit. A new reinforced liner is to be installed. | ||||
1877128110 | 2013-06-13 | This is a producing pump jack well. The permanent fencing will be installed next week. There were no problems noted at the time of the inspection | ||||
244760626 | 2013-04-12 | The BOP was tested to 520 psig for over 15 minutes with no pressure drop. The pressure was released and both relief lines are open. | ||||
244760626 | 2013-04-12 | The BOP was tested to 520 psig for over 15 minutes with no pressure drop. The pressure was released and both relief lines are open. | ||||
617607721 | 2015-02-09 | This is a producing pump jack well. There were no problems noted at the time of the inspection. | ||||
-65868442 | 2013-04-18 | Drilling ahead at 3759' on fluid in the shale. There were no problems noted at the time of the inspection. | ||||
660426209 | 2013-04-03 | The location is being cut. | ||||
-667989257 | 2013-04-04 | The pits are being dug. | ||||
-672425550 | 2013-04-10 | Ran 7 joints of 11-3/4 surface casing to 314'. Petroset cemented with 350 sacks of class A cement. See the casing ticket for more details. | ||||
-672425550 | 2013-04-10 | Ran 7 joints of 11-3/4 surface casing to 314'. Petroset cemented with 350 sacks of class A cement. See the casing ticket for more details. | ||||
-686985921 | 2013-07-18 | The fence is being erected around the well and the tank battery as per the permit conditions. Preliminary Restoration is passed. | ||||
904247604 | 2013-04-16 | Drilling ahead at 3076' on fluid. There were no problems noted at the time of the inspection. | ||||
904247604 | 2013-04-16 | Drilling ahead at 3076' on fluid. There were no problems noted at the time of the inspection. | ||||
-939695872 | 2013-05-06 | The second working pit, solidified on Thursday past, has been closed. The well head is fenced off. |