If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23138 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.25848516,"lon":-81.63787469,"icon":""}]} |
County: Summit | |
Municipality: | |
Operator Name: GONZOIL INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-08-06 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Plugged and Abandoned | |
Violations: 0 | |
Latitude: 41.25848516 | |
Longitude: -81.63787469 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 1733.0 | 274.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1314646124 | 2011-08-15 | Wildcat is starting to move off location. The pits are fenced, lined and in good condition. Solidification is scheduled for 8/18. No violations at this time. | ||||
1314845111 | 2011-08-24 | The well has been fraced and Bishop Well Service is on site to run tubing and rods. The drilling pits have been solidified and covered over. No violations at this time. | ||||
1429969615 | 2011-09-20 | The well has been fraced and tubing and rods are in the hole. The pump jack and the tank battery equipment is on site but has not been set or connected. | ||||
1596779136 | 2011-08-02 | The location is built and GonzOil is waiting for the rig which should arrive in the next few days. | ||||
1665256056 | 2011-08-18 | Daily Excavating and Chem Tech are on site to solidify the drilling pits. Three loads of dust will be applied and mixed into the pits. A fourth load will be applied if necessary. The pit fence is removed and will not be reset unless the pits are not closed by the end of the day. | ||||
-1672455950 | 2011-08-11 | Wildcat is drilling ahead on air/soap at 2900'. The pits are fenced, lined and in good condition. The blow pit is also being tarped to control overspray during drilling and making connections. | ||||
-2111027257 | 2011-11-30 | Preliminary Restoration is approved. | ||||
808646265 | 2011-08-05 | Wildcat is moving on location and should spud the well later today. No violations at this time. | ||||
-868290646 | 2011-07-05 | Dailey Excavating is working on the entrance and the location. | ||||
908958288 | 2011-08-09 | Wildcat is tripping out of the hole to run in directional tools. The pits are fenced, lined and in good condition. No violations at this time. |
For data sources see[2]