Well ID: 34-121-24350 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.77991389,"lon":-81.65681237,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: ANADARKO E & P ONSHORE LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-01-13 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.77991389 | |
Longitude: -81.65681237 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 193797.0 | 38313.0 | ||||
2013-12 | 62339.0 | 1863.0 | ||||
2013-3 | 47678.0 | 3011.0 | ||||
2013-6 | 43185.0 | 2404.0 | ||||
2013-9 | 44170.0 | 1797.0 | ||||
2014-3 | 34140.0 | 91.0 | 1410.0 | 91.0 | ||
2014-4 | 29151.0 | 92.0 | 1018.0 | 92.0 | ||
2015-1 | 31572.0 | 90.0 | 905.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1002365641 | 2012-01-20 | On site to witness testing of Blow Out Preventer (BOP). The blind and pipe rams were tested at @5000 PSI. The choke system and annular were tested at @3000 PSI. All systems passed their test. Once the stack test was completed they tested the casing seat at 1800 PSI for 30 minutes, with no decline in pressures. | ||||
102310481 | 2012-01-14 | Received phone call from Glen Smith drilling consultant for drill site of encountering H2S gases during drilling operations, went to site and monitored gas at request of consultant and had high readings so decision was made to convert to fluid drilling for the remainder of this section of wellbore, they will cement casing in place within the next couple days and it was suggested that they monitor well site for any potential hazards and if any more H2S is detected call me and advise of level detected.
Note:5233' trip point and gas was noted@5140'-5190' with 330ppm according to Stragraph records. |
||||
1268897760 | 2013-05-02 | On day of inspection Rick Trippel, Mallory Stanton, Teresa McQuade and I stopped in to look at well. Curt Cameron was in at site to accompany us. | ||||
1324331084 | 2011-12-19 | Moving in top hole rig(Ziegenfuss) to set conductor and mouse hole,they should be moving in Key Energy Drilling rig by the end of year. | ||||
1327617883 | 2012-01-26 | When I stopped at the drill site they were coring the Utica Shale at @6620'. They will make 5 core barrel runs, then drill into the Trenton Lime, log well and then proceed with plug back procedures. | ||||
1328565933 | 2012-02-06 | Stopped by drill rig for update they were drilling lateral at 9740' should be at total depth later this week. | ||||
1328825846 | 2012-02-09 | Stopped by drill site for update on upcoming casing job rig was at total depth of 12,000'and conditioning wellbore for potential e-logging job and then run casing. | ||||
1330127586 | 2012-02-22 | Inspection revealed that well site is being prepared for upcoming frac job which should take place 3/3/2012. | ||||
1399950136 | 2013-10-29 | The preliminary restoration requirements have been met. | ||||
1585507728 | 2012-01-13 | Stopped by drill site for update they were drilling in lime formation @5007' should be at casing point within the next 24 hours if bit holds out. | ||||
-1636506772 | 2013-01-30 | I accompanied Pat Shreve on the inspection of this well. | ||||
-1748884933 | 2013-10-29 | My inspection today finds the well is in production. The tank battery consists of eight 400 bbl tanks all contained in a dike. The preliminary restoration is complete. | ||||
2014824731 | 2013-01-30 | Well is a producing with a large Christmas tree assembly. There are large 400 barrel production tanks and dike and identification are in place. | ||||
-423896489 | 2012-10-09 | Jake Glasscock and I stopped in to look at well. There is a large production operation on the auxiliary pad. There are 8-400 barrel tanks with leak proof dike. Well is equipped with large Texas style Christmas tree of a well head. There are no violations on day of inspection. | ||||
777620951 | 2012-10-09 | I accompanied Pat Shreve to well site and production facility. Well is currently in production. There were eight 400 barrel tanks on site |
For data sources see[2]