If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-24347 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.18095371,"lon":-81.30974196,"icon":""}]} |
County: Portage | |
Municipality: | |
Operator Name: GONZOIL INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2007-08-17 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 41.18095371 | |
Longitude: -81.30974196 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2008-0 | 3763.0 | 729.0 | ||||
2009-0 | 6167.0 | 612.0 | ||||
2010-0 | 3854.0 | 386.0 | ||||
2011-0 | 2871.0 | 252.0 | ||||
2012-0 | 2555.0 | 237.0 | ||||
2014-0 | 1705.0 | 365.0 | 197.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1188434641 | 2007-08-20 | Wildcat is drilling ahead. The pits are lined and in good condition. No violations at this time. | ||||
-1443994126 | 2007-08-30 | The drilling pits were solidified and closed on 8/29. No violations at this time. | ||||
1865357987 | 2008-05-09 | The site needs to be finish graded and seeded before preliminary restoration is approved. | ||||
-2084964313 | 2007-08-23 | Wildcat should finish drilling later today. The pits are lined and in good condition. No violations at this time. | ||||
-299363327 | 2007-08-09 | The drilling location has been cut, cleared and graded. The drilling rig should arrive next week. | ||||
-736734246 | 2007-08-27 | On site to witness grouting the top of the hole with 9 sack grout. GonzOil did not have cement returns while cementing the surface casing. The top of the surface cement was estimated by GonzOil to be between 50 and 60 feet. The annulus space between the 8-5/8 casing and the borehole required 7 cubic yards of grout to fill. Also filled the rathole and the mousehole. | ||||
889456478 | 2008-07-29 | Preliminary restoration is approved. | ||||
-910043756 | 2007-08-17 | Wildcat Drilling is moving on site and should spud later today. The pits will be dug as soon as the rig is in. |
For data sources see[2]