X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24164

Well Details

Well ID: 34-059-24164
Loading map...
County: Guernsey
Municipality:
Operator Name: ANSCHUTZ EXPLORATION CORP
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2010-07-07
Unconventional: No
Configuration: Vertical
Well Status: Final Restoration
Violations: 0
Latitude: 40.19453913
Longitude: -81.58519732

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1127211144 2011-03-21 Restoration work at site satisfactory pit has been filled in and site restored and vegetation has been established.
1279580291 2010-07-17 On site to witness testing of BOP and choke manifold system,blind ram was tested at 1500# for 15 min with no decline in pressure and pipe ram was tested at 1500# for 15 min with no decline in pressure and annular was also tested at 1500# for 15 min with no decline and also choke manifold valves and line assembly were tested at 1500# also.
1280187848 2010-07-23 On site to retest BOP stack Weatherford pressured up to 3500 psi on blind ram and pipe ram and 1500 psi on annular with no decline in pressure on all three test.
1280795436 2010-08-02 Stopped by drill rig for update they were drilling on fluid@7022',consultant hopes to be at Trenton top by the end of the day.
1282946964 2010-08-27 On site to witness contractor solidify working pit and start reclaim work at site of dry hole.
1526645828 2010-08-16 Stopped by drilling operation to check on status of well, they were pulling E-Log from well and driller stated they would be ready to plug well possibly 8/17/10.
1536098435 2010-07-29 Stopped by drill site for update they were drilling at 6282' on air/foam at this point, once angle part of hole is completed they will convert to fluid drilling until total depth is achieved.
250730437 2010-08-05 Stopped by drill rig for update they were drilling bottom hole@7877' driller stated that Total Depth would be@7900' then they will circulate hole and come out of hole standing drill string back in derrick until E-Logs were run and decision was made to complete well or plug said well.
341819656 2010-07-19 Stopped by drill site for update on upcoming pipe job, rig was drilling@3492' and top of Big Lime was at 3420' operator switched to fluid drilling at 3476' and will continue to drill on fluid until they set 7 casing through Oriskany Sand, well is located in buffer zone of Columbia Gas Storage field.
527765206 2010-08-04 Stopped by drill rig for update on upcoming casing job company rep stated that they should be ready to run casing and cement in place 8/6/10.
-758803073 2010-07-01 Stopped by future drill site and check area for potential problems ,located 2 water wells in close range of drill site, suggested that they set conductor pipe below depth of water wells.
771011872 2010-07-12 Union Drilling moving in on site to drill new well.

For data sources see[1]

References

  1. "Ohio Department of Natural Resources RBDMS". [1]. 2015-06-19. Retrieved 2015-06-20.