If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-105-23662 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.08179466,"lon":-82.2899169,"icon":""}]} |
County: Meigs | |
Municipality: | |
Operator Name: ECLIPSE RESOURCES-OHIO LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2010-05-20 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.08179466 | |
Longitude: -82.2899169 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-0 | 9.0 | 40.0 | ||||
2011-0 | 16.0 | 67.0 | ||||
2012-0 | 10.0 | 79.0 | ||||
2013-0 | 0.0 | 58.0 | ||||
2014-0 | 7.0 | 365.0 | 0.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1615790421 | 2011-09-08 | Good ID on well, pits closed, good grade, vegetative cover, no drilling equipment on site, no erosion. PR pass. | ||||
737358476 | 2010-05-21 | Witnessed surface job. Good returns were observed at the surface. The cement dropped approximately 1' after 1/2 hour. Note: The installation of the surface casing was not observed. Mr. Randy Rainer with G&L Drilling Comp states that a cement basket was not installed. |
For data sources see[2]