Well ID: 34-059-24138 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.03588822,"lon":-81.5670058,"icon":""}]} |
County: Guernsey | |
Municipality: | |
Operator Name: HILL DAVID R INC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-03-17 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 40.03588822 | |
Longitude: -81.5670058 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2011-0 | 40.0 | 10.0 | ||||
2012-0 | 5069.0 | 1715.0 | ||||
2013-0 | 7491.0 | 1512.0 | ||||
2014-0 | 4133.0 | 365.0 | 888.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1155213994 | 2011-05-27 | On site to witness frac job Producers Services pumped a total of 80,228 gal of fresh water in well and perfs were noted@5001'-5066',62 shots and cement top on 4.5 was noted @4110' according to bond log and average treating pressures were noted@1045-1480 psi and ISIP was 867 psi and after 5 min it was noted@810 psi well was shut in for 2 hours and then flowback process began. | ||||
1300044124 | 2011-03-13 | Received call from site contractor wanting to meet to discuss site preparation and pit construction, it was suggested that they place silt fence in area of small stream to prevent sediment from entering waterway and also stone on lease road was discussed . | ||||
1300222216 | 2011-03-15 | Visited site along with inspector Shawn Murphy and we discussed erosion control along small stream and air pit construction for typical drilling operation. | ||||
1300969301 | 2011-03-22 | Stopped by drilling rig for update on upcoming surface jog they were at 900' drilling on fluid and while at site kelly hose blew, and rig was down for repair. | ||||
1302289619 | 2011-04-07 | On site to witness company solidify working pit and air pit Chemtech delivered two tankers of material and Buckeye Services stirred in material and once mixed they began closing of pits, once filled then they began roughing in location they will frac well as soon as weather permits. | ||||
1310680782 | 2011-07-14 | Restoration work at site satisfactory pit has been closed and well is equipped with pumping unit and tubing and rods and 2-100 bbl tanks and 1-50 bbl water tank within dike area. | ||||
1329391513 | 2012-02-15 | Upon inspection of the well site found drilling pits filled and vegetation established, at the well head found 4.5 casing -1.5 tubing with production valves open and well being produced by means of a pumping unit, at the production fluid storage area found the following equipment all in a established dike 2-100 barrel tanks and a single 1200 gallon plastic tank separator and gas meter with proper well identification in place. | ||||
1359668936 | 2013-01-30 | Restoration work at site satisfactory pit has been filled in and site restored and vegetation has been established.
Note: Well is equipped with pumping unit and tubing and rods and 2-100 bbl storage tanks and 1-20 bbl water tank and they are located within dike area. |
||||
2142184663 | 2011-03-18 | Stopped by drill rig for update on upcoming surface job .they were drilling @450' and they put soap on hole at 175' if rig doesn't break down should set 8 casing late tonight or early morning. | ||||
-596320900 | 2011-03-28 | Drilling ahead@5038' should reach total depth later today. |
For data sources see[2]