Well ID: 34-121-24348 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.72200981,"lon":-81.60989642,"icon":""}]} |
County: Noble | |
Municipality: | |
Operator Name: ANADARKO E & P ONSHORE LLC | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-03-07 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.72200981 | |
Longitude: -81.60989642 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-0 | 126703.0 | 30287.0 | ||||
2013-12 | 34021.0 | 2297.0 | ||||
2013-3 | 39133.0 | 3722.0 | ||||
2013-6 | 36160.0 | 3026.0 | ||||
2013-9 | 39970.0 | 3055.0 | ||||
2014-3 | 25843.0 | 76.0 | 1834.0 | 76.0 | ||
2014-4 | 22122.0 | 92.0 | 1321.0 | 92.0 | ||
2015-1 | 25998.0 | 90.0 | 1651.0 | 90.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
1328217770 | 2012-02-02 | Inspection revealed that top hole rig set 140' of 20 casing and they are presently drilling 19 hole to set approximately 500' of 16 and cement it in place. | ||||
1330513359 | 2012-02-26 | On site to witness testing of Blowout Prevented they tested blind rams@2500 psi and pipe rams and annular respectively with no decline in pressures all testing passed will retest entire stack after intermediate casing string is set and cemented in place. | ||||
1396268746 | 2014-03-31 | My inspection today finds the well is in production and the production facility is equipped with eight 400 bbl tanks and a compressor station with a stripping unit. Proper identification is posted and production records are current. The gate on the access road is locked. | ||||
-1511397055 | 2012-03-09 | Stopped by drill rig for update they were drilling lateral section of well@6635'. | ||||
-1662682864 | 2013-07-11 | Restoration work at site is satisfactory well is in production and site is equipped with four tanks and compressor station and stripping unit and gates to production facility and well site have locks on them to keep out vandals. | ||||
-2125089516 | 2012-02-09 | 140' of 20 ran into well and mousehole has been set with top hole rig Key Energy will be moving in on pad next week. | ||||
35855860 | 2012-03-11 | Drilling @8930' gas show encountered while cutting curve and they have been losing a small amount of oil base mud while drilling they should be at total depth by the end of week. | ||||
-561264592 | 2012-02-29 | Preparing well site for upcoming completion job,Trican Frac Services should be on site next week to start frac process. | ||||
-669183104 | 2015-04-23 | My inspection today finds the well is equipped with 2.875 tubing with a plunger lift system. The tank battery has been down sized to two 400 barrel tanks. All production valves are open. | ||||
-693544313 | 2012-03-05 | Stopped by rig for up date they were at 7300' out of hole waiting on loggers to log well then they will run drill string back into well and plug back to prepare to drill horizontal. |