X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24367

Well Details

Well ID: 37-051-24367
Loading map...
County: Fayette
Municipality: Henry Clay Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 146309
Farm/Lease Name: HUMBERSTON UNIT 1H
First Permit Date: 2010-07-13
Last Permit Date: 2010-07-13
Spud Date: 2011-01-28
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.740383
Longitude: -79.439622

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 0.0 0.0 0.0 0.0 0.0 0.0
2014-1 0.0 0.0 0.0 0.0 0.0 0.0
2014-2 0.0 0.0 0.0 0.0 0.0 0.0
2015-02 0.0 0.0 0.0 0.0 0.0 0.0
2015-01 0.0 0.0 0.0 0.0 0.0 0.0
2015-03 0.0 0.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-1 DRILL CUTTINGS 808.15 Tons LANDFILL 100172 ARDEN LANDFILL WASHINGTON PA
2011-1 DRILLING FLUID WASTE 1.0 Bbl LANDFILL NY STATE #32S11 ALLIED WASTE SYSTEMS NIAGARA FALLS NY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1958062 2011-02-04 No Violations Noted HORIZONTAL MARCELLUS. PLANNING TO SET INTERMEDIATE STRING OF 95/8" CASING AND CEMENTING EARLY MORNING @ 1817'. CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 1535' AT PRESENT TIME.
1958068 2011-01-31 No Violations Noted HORIZONTAL MARCELLUS, PLANNING TO SET SURFACE TONIGHT @ 550' AND CEMENTING .E&S AND PITS ARE IN GOOD CONDITION.
1959310 2011-03-22 No Violations Noted
1960986 2011-03-21 No Violations Noted HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 7536' TODAY.
1961190 2011-03-07 No Violations Noted HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD.UDI # 59 MOVING ON AND SETTING UP 3/7/2011.
1977465 2011-06-01 No Violations Noted
1984217 2011-03-31 No Violations Noted HORIZONTAL MARCELLUS,CLOSED LOOP SYSTEM WORKING GOOD. DRILLING @ 12,230' TODAY. PLANNING (TD) TONIGHT @ 12,682' , RUNNING 51/2" CASING TONIGHT,CEMENTING LATE 4/1/2011.
2134860 2013-01-30 No Violations Noted Site ID sign in place, E&S and PPC plan in box, area gated and locked. Well head labeled, E&S in place and functioning no accelrated erosion.
2165178 2013-05-09 No Violations Noted Site Id in place. Site gated and locked. Restoration work has been completed. Soil piles, sed traps, and diversion channels are removed, seeded and mulched.
2188009 2013-07-30 No Violations Noted Well inactive, site locked, new act 9 sign in place, no E&S issues.
2373211 2015-05-20 No Violations Noted On 05/20/15 at approximately 0900 hours I met with representatives of Chevron Appalachia LLC to discuss the restoration of the Humberston Unit. The site had been disturbed by a farmer spreading fertilizer and getting his equipment stuck. The location of the removed impoundment was sparsely vegetated. The determination was that Chevron is going to repair the damage caused by the farmer and seed and mulch the location and submit for an NOT once they achieve a uniform 70% growth.

For data sources see[3]

References