X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-24817

Well Details

Well ID: 37-125-24817
Loading map...
County: Washington
Municipality: Morris Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 148725
Farm/Lease Name: LAMPERSKI NV58BHS
First Permit Date: 2012-08-15
Last Permit Date: 2013-10-15
Spud Date: 2012-12-05
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 40.059041
Longitude: -80.31125

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 0.0 0.0 0.0 0.0 0.0 0.0
2014-1 0.0 0.0 0.0 0.0 0.0 0.0
2014-2 0.0 0.0 0.0 0.0 0.0 0.0
2015-02 0.0 0.0 0.0 0.0 0.0 0.0
2015-01 0.0 0.0 0.0 0.0 0.0 0.0
2015-03 110037.09 24.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2013-1 DRILL CUTTINGS 204.22 Tons LANDFILL 100172 ARDEN LANDFILL WASHINGTON PA
2013-1 DRILL CUTTINGS 493.59 Tons LANDFILL PAD059087072 MAX ENVIRONMENTAL TECHNOLOGIES INC BULGER FACILITY BULGER PA
2013-1 DRILLING FLUID WASTE 89.64 Bbl LANDFILL PAD004835146 MAX ENVIRONMENTAL TECHNOLOGIES INC YUKON FACILITY YUKON PA
2014-2 FRACING FLUID WASTE 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2121560 2012-12-05 No Violations Noted On December 5, 2012, I stopped at CONSOL Energyï¾’s NV-58 site to check the site.

A Safety Plan was inside the mailbox, as was copies of each of the Well Permits. Additional E&S controls were installed since my last visit. E&S revisions were drawn into the siteï¾’s E&S plan and I initialed them. The run-off off channels were now rocked and coconut-fiber matting placed on the bare slopes. On the west side of the pad extra silt sox and silt fencing were placed on the steep hillside beside the west sediment trap. The site appears to be in good order.

2129803 2013-01-09 No Violations Noted
2182032 2013-05-23 No Violations Noted

For data sources see[3]

References