X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-27943

Well Details

Well ID: 42-129-27943
Loading map...
County: Westmoreland
Municipality: Salem Township
Operator Name: ATLAS RESOURCES LLC
Farm/Lease Name: CARR 19A
First Permit Date: 2009-06-11
Last Permit Date: 2009-06-11
Spud Date: 2009-09-01
Unconventional: Yes
Horizontal: No
Producing: Yes
Violations: None
Latitude: 40.37975
Longitude: -79.471777

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1819344 2009-07-29 No Violations Noted MARCELLUS - drilling in process/E&S ok/ID&pit ok
1819431 2009-08-10 No Violations Noted MARCELLUS - tophole completed - rig moved off/E&S ok/ID and pit ok
1823372 2009-08-19 No Violations Noted MARCELLUS - current depth 2286ft - attempting to cement unexpected water @ 2247ft/E&S ok/ID&pit ok
1823375 2009-08-20 No Violations Noted MARCELLUS - well plugged due to downhole problems/E&S ok/ID&pit ok
1825836 2009-09-03 No Violations Noted skid rig - redrilling/E&S ok/ID&pit ok
1825838 2009-08-25 No Violations Noted drill pipe stuck in hole - plugging - rig to be skid/ID&pit ok/E&S ok
1827799 2009-09-10 No Violations Noted drilling - skid rig/ID&pit ok/E&S ok
1831004 2009-09-22 No Violations Noted MACELLUS - drilling commenced/E&S ok/ID&pit ok
1831005 2009-09-17 No Violations Noted MARCELLUS - drilling/E&S ok/ID&pit ok
1836303 2009-09-24 No Violations Noted At the time of the inspection, drilling was in process. Pit appears to be sound. E&S controls installed properly (filter socks, rip rap). There is no evidence of accelerated erosion or sedimentation on the access road or well site. The operator should continue to monitor the site for erosion and sedimentation.
1843921 2009-11-12 No Violations Noted MARCELLUS - drilling&frac complete/E&S ok/ID&pit ok
1873485 2010-03-25 No Violations Noted Carr 19 was a rig skid. The original hole has been plugged and the monument was located.

Carr 19A is drilled and in production.

1873487 2010-03-08 No Violations Noted The well has been drilled and is in production. Brine tanks appear to be in sound condition. The site has been re-graded and is rocked. E&S controls are in place. There is no evidence of erosion and sedimentation on the access road or well site. The site will be revisited in the spring to check for uniform vegetative growth.
1969835 2011-04-22 No Violations Noted The well has been drilled and is in production. Tag located. Brine tanks appear to be in sound condition. E&S controls are in place. There is no evidence of erosion and sedimentation on the access road or well site. The vegetation is well established and the site is restored at this time.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 33.0 7.0 0.0 0.0 0.0 0.0
2012-1 226.0 182.0 0.0 0.0 0.0 0.0
2011-2 37.0 184.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-3 23398.0 235.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2009-0 DRILLING 878.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT CASTLE ENV
2009-0 FRACKING FLUID 14185.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT CASTLE ENV
2009-0 FRACKING FLUID 14185.0 Bbl REUSE OTHER THAN ROAD SPREADING DANCHO/BROWN #5
2009-0 FRACKING FLUID 14185.0 Bbl REUSE OTHER THAN ROAD SPREADING HONSAKER #16
2009-0 FRACKING FLUID 14185.0 Bbl REUSE OTHER THAN ROAD SPREADING HUCZKO #2
2009-0 FRACKING FLUID 14185.0 Bbl REUSE OTHER THAN ROAD SPREADING SMOUSE #5
2009-0 FRACKING FLUID 14185.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2010-3 DRILLING FLUID WASTE 878.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA (NEW CASTLE) NEW CASTLE PA
2010-3 FRACING FLUID WASTE 1315.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA (NEW CASTLE) NEW CASTLE PA
2010-3 PRODUCED FLUID 537.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA (NEW CASTLE) NEW CASTLE PA
2010-3 FRACING FLUID WASTE 12130.0 Bbl IDENTIFY METHOD IN COMMENTS NOT LISTED (PROVIDE NAME & ADDRESS IN COMMENTS) PA
2010-3 PRODUCED FLUID 4226.0 Bbl IDENTIFY METHOD IN COMMENTS NOT LISTED (PROVIDE NAME & ADDRESS IN COMMENTS) PA
2010-3 FRACING FLUID WASTE 1160.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2010-3 PRODUCED FLUID 60.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2012-1 PRODUCED FLUID 620.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING PA

References