If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-24914 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.332286,"lon":-79.200278,"icon":""}]} |
County: Westmoreland | |
Municipality: Fairfield Township | |
Operator Name: TEXAS KEYSTONE INC | |
Well Pad ID: | |
Farm/Lease Name: JOHN BORCHIN 4-WES | |
First Permit Date: 2003-04-16 | |
Last Permit Date: 2003-04-16 | |
Spud Date: 2003-07-03 | |
Unconventional: No | |
Horizontal: No | |
Well Status: ACTIVE | |
Violations: 5 | |
Latitude: 40.332286 | |
Longitude: -79.200278 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2003-0 | 15512.0 | 232.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2004-0 | 2199.0 | 189.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2005-0 | 1779.0 | 278.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2006-0 | 1022.0 | 208.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2007-0 | 867.0 | 155.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2008-0 | 776.0 | 197.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 604.0 | 127.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 306.0 | 71.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 232.0 | 81.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 666.0 | 177.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2013-0 | 391.0 | 183.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2014-0 | 280.0 | 212.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 40.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | FLUID RECOVERY SERVICE JOSEPHINE FACILITY | JOSEPHINE | PA |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1200874 | 2003-01-15 | No Violations Noted | well staked/proposed site >200' from H2O supply & stream - objection not sustainable | |||
1256183 | 2003-07-25 | Violation(s) Noted | drilling complete/E&S ok/drill cuttings below casing seat stored on ground | 358779 | 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table | |
1256183 | 2003-07-25 | Violation(s) Noted | drilling complete/E&S ok/drill cuttings below casing seat stored on ground | 358780 | 401CSL - Discharge of pollultional material to waters of Commonwealth. | |
1268103 | 2003-09-09 | Violation(s) Noted | equipped/site backfilled - graded - emergent veg/tank&tag ok/E&S pipeline | 363997 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | |
1268103 | 2003-09-09 | Violation(s) Noted | equipped/site backfilled - graded - emergent veg/tank&tag ok/E&S pipeline | 363997 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | |
1275335 | 2003-10-02 | Violation(s) Noted | joint inspect with oper to discuss needed corrective actions - oper agreed to improve E&S control measures | 367448 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | |
1314156 | 2004-03-02 | Outstanding Violations - Viols Req'd | equipped/tank&tag ok/E&S site ok - perm. controls to be installed on pipeline(temp installed) - advice on runoff control | 384426 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | |
1386274 | 2004-10-05 | No Violations Noted | equipped/tank&tag ok/E&S advice - pipeline&road | |||
1474202 | 2005-08-17 | No Violations Noted | equipped/restored - advice on E&S road & fabric/tank&tag ok | |||
1811572 | 2009-07-07 | No Violations Noted | Drilling completed on 7/3/2003. Well site has been restored. Brine tank is in sound condition. Well site has approximately 95% vegetative cover. Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. The access road should be graded. 2. A clean rock large enough to stabilze the road should be put down to give a good base. 3. A smaller rock should then be compacted in over the subbase. 4. Lastly a waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well. Operator should continue to monitor the well site for erosion and sedimentation. | |||
1813138 | 2009-07-15 | No Violations Noted | Drilling completed on 7/3/2003. Well site has been restored. Brine tank is in sound condition. Well site has approximately 95% vegetative cover. Large ruts have formed in the access road. As a result sediment is carried down the access road and beyond the well site. The department recommends the following: 1. Grade the access road in the areas that have developed large ruts. 2. Apply large clean rock to low lying areas and section of access road that has a down slope gradient. 4. A waterbar with a rock outlet.should be implimented halfway down the steepest slope of the road as it decends to the well. 4. Lastly the well pad should be rocked to stabilize and prevent erosion and sedimentation. Operator should continue to monitor the well site for erosion and sedimentation. |
For data sources see[3]