37-063-37308

Well Details

Well ID: 37-063-37308
Loading map...
County: Indiana
Municipality: North Mahoning Township
Operator Name: XTO ENERGY INC
Well Pad ID: 147685
Farm/Lease Name: A K STEAR A UNIT 1H
First Permit Date: 2012-01-04
Last Permit Date: 2012-01-04
Spud Date: 2012-05-22
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 40.860836
Longitude: -79.078463

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 242378.0 180.0 0.0 0.0 0.0 0.0
2013-2 341047.0 184.0 0.0 0.0 0.0 0.0
2014-1 240643.0 181.0 0.0 0.0 0.0 0.0
2014-2 205700.0 184.0 0.0 0.0 0.0 0.0
2015-02 27602.0 28.0 0.0 0.0 0.0 0.0
2015-01 31183.0 31.0 0.0 0.0 0.0 0.0
2015-03 29760.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-1 DRILL CUTTINGS 325.02 Tons LANDFILL 101397 ADVANCED DISPOSAL SERVICES GREENTREE LANDFILL KERSEY PA
2012-1 DRILL CUTTINGS 309.25 Tons LANDFILL 100434 EVERGREEN LANDFILL BLAIRSVILLE PA
2012-2 DRILL CUTTINGS 452.73 Tons LANDFILL 101397 ADVANCED DISPOSAL SERVICES GREENTREE LANDFILL KERSEY PA
2012-2 DRILL CUTTINGS 50.7 Tons LANDFILL 100434 EVERGREEN LANDFILL BLAIRSVILLE PA
2013-1 FLOWBACK FRACTURING SAND 93.67 Tons LANDFILL 100434 EVERGREEN LANDFILL BLAIRSVILLE PA
2013-1 FRACING FLUID WASTE 270.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD013826847 MCCUTCHEON ENTERPRISES INC APOLLO PA
2013-1 FRACING FLUID WASTE 366.0 Bbl INJECTION DISPOSAL WELL 34-133-24189 MEYERS #2 (SWIW #33) ATWATER OH
2013-1 FRACING FLUID WASTE 65.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2013-2 FLOWBACK FRACTURING SAND 94.0 Tons LANDFILL 100434 EVERGREEN LANDFILL BLAIRSVILLE PA
2013-2 PRODUCED FLUID 345.0 Bbl INJECTION DISPOSAL WELL 34-059-24067 DEVCO UNIT #1 (SWIW #11) CAMBRIDGE OH
2013-2 PRODUCED FLUID 5.0 Bbl RESIDUAL WASTE TRANSFER FACILITY PAD013826847 MCCUTCHEON ENTERPRISES INC APOLLO PA
2013-2 PRODUCED FLUID 100.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009 RES WATER BUTLER PA
2013-2 PRODUCED FLUID 1.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA
2014-1 PRODUCED FLUID 3.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009 RES WATER BUTLER PA
2014-1 PRODUCED FLUID 200.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185 RESERVED ENV SVC WASTE WATER TREATMENT FACILITY MOUNT PLEASANT PA
2014-2 PRODUCED FLUID 1.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009 RES WATER BUTLER PA
2014-2 PRODUCED FLUID 713.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005 RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2064199 2012-05-01 In Compliance with Policy Pre-construction meeting, for multi-well pad, with XTO Reps Dan Rice (Construction) and Tom Burnett (EHS) and First Class Energy (Construction Contractor). Well permit issued 1/4/12. Proper signage and ES plans located onsite. Reviewed ES plans and construction sequence with individualï¾’s onsite.

Valid ESCGP-1 obtained. Site located within Special Protection waters.

Well(s) staked not yet drilled, pad not yet constructed. Operator appears to be in compliance with current policy and will commence earth disturbance work once bmp's are in place.

2071248 2012-05-25 No Violations Noted
2073673 2012-06-05 No Violations Noted During this inspection, XTO rep Tom Baun and First Class Energy Rep( Construction Contractor) present. Site ID sign, ES plan, ESCGP-1 located onsite. Rig currently tore down, it is believed top hole drilled. Spud 5/22/12. minor changes have been noted on ES plan, the addition of a rock lined culvert along access road to well site and removal of culvert (per Penn Dot due to drainage on SR 410). Previously disturbed areas covered with matting and seeded/mulched with observed growth not quit 70% uniform coverage. Pad adequately rocked. No accelerated E&S issues on well pad. Temporary containment located onsite beneath former location of rig, appears sound. XTO reps and myself examined access road leading to a impoundment, not yet constructed. A culvert was installed and a sediment basin, it appears that due to grade and recent heavy rains the sediment basin could not handle flow; therefore, XTO would like to install a water bar leading to culvert located down gradient near well pad entrance. Dept ok'ed no increase in acerage or distrubed area-


2081473 2012-07-06 No Violations Noted
2086444 2012-07-17 No Violations Noted
2089278 2012-07-31 No Violations Noted
2092834 2012-08-16 No Violations Noted *Well site located within special protection water*

During this inspection, Site ID sign, ES plan, ESCGP-1 located onsite. Rig onsite cementing and pressure testing. Previously approved minor changes noted on ES plan have been implemented, including rock lined water bar on impoundment roadway as well as rock lined ditches along access road entrance. Although it is recommended that operator maintain culvert outlets in order to prevent a possible pollution event.

Access road entrance has also been blacktopped since last inspection. Previously disturbed areas covered with matting and seeded/mulched with observed growth > 70% uniform coverage. Pad adequately rocked. No accelerated erosion or sedimentation issues noted on well pad. It appears sediment trap is properly installed and functioning as well as all temporary bmps'. Temporary containment located onsite beneath rig appears sound. No industrial waste concerns noted.

No violations noted during this inspection.

2092962 2012-08-18 No Violations Noted
2101744 2012-09-20 No Violations Noted
2108412 2012-10-15 No Violations Noted At the time of this inspection wells actively being fraced. Bmp's installed and maintained, noaccelerated erosion or sedimentation concerns noted on access road or well site. Hence well site is located with HQ waters, department reiterated to operator that deflectors are not considered ABACT bmp's and in order to sustain sufficient sediment removal an additoinal ABACT bmp is reccomended, department referred operator to currentl ES manual for list of acceptable ABACT bmp's. Operator agreed to install water delfector in access road, as well as add additional compost sox in order to increase the effiencety of sediment removal. Based on this inspection, if operator installs/maintains additonal bmp's as outlined in ES manual and revised plans department shall ok minor changes as noted.
2109417 2012-10-18 No Violations Noted
2128914 2013-01-08 No Violations Noted Access road entrance adequately rocked, although due to recent thaw and contiual traffic on/off site is reccomended that operator closely monitor and maintain access roadway as needed to ensure that mud does not exit the well site onto SR 210. Well drillled and equipped for prodcution. Well head surrounded by wire fence, recommend operator install a visible, permanent well tag on well head as per regulation. Prodcution equipment contained with in a metal containment unit. Brine tank appears sound. No evidence of Industrail waste concerns. Site snow covered; therefore, unable to adequately assess temporary stablization measures and temporary bmp functioning capacity. Although no accelerated erosion or sedimeantion issues observed. Department recommends that operator install a temp bmp beneath soil pile located on back side of well pad in order to prevent a potentail pollution event as a result of recent thaw, piles appears to be frozen. No violations noted at time of this inspection

Spud: 5/22/12, TD 7/8/12

2137936 2013-02-07 No Violations Noted
2168010 2013-05-03 No Violations Noted Inspt in response to restoration extension request.

At time of inspection, well equipped for production. Wellhead located in center of pad, surrounded by chain-link fence and cement barriers. Well tag present, legible. One on-site brine tank, appears sound. BT, production equipment located in lined secondary metal containment unit. Gravel, accumulated water within containment unit. Pad stabilized with rock. Downslope perimeters of pad vegetated. Area upslope of pad minimally vegetated, currently stable with aid of erosion blanket. Ruts observed around backside of containment unit. Department recommends Operator re-seed/mulch areas upslope of pad to ensure adequate vegetation capable of resisting accelerated E&S until final permanent restoration is achieved and also maintain areas of rutting to prevent any possible pollution events from occurring. Based on Operator's written request and this site inspection, an extension for site restoration will be granted until April 8, 2015.

2222610 2013-11-18 No Violations Noted At time of inspection, well equipped for production. Spud date was 5/22/2012. Wellhead surrounded by chain-link fence and cement barriers. Well tag present, legible.

One on-site brine tank, sound. Brine tank, production equipment located in lined secondary metal containment unit. Gravel, accumulated water within containment unit.

Access road in good condition. Pad stabilized with rock. Downslope perimeters of pad vegetated. Areas upslope of pad vegetated, stable with aid of  erosion blanket.

Ruts observed around backside of containment unit. Department recommends Operator maintain areas of rutting and properly empty and dispose of accumulation in containment as per current regulations. Extension for site restoration previously granted until April 8, 2015 (inspection record 2168010).

2248812 2014-02-26 No Violations Noted RTPT. At time of inspection, well equipped for production. According to records, drilling occurred 5/24/2012-7/8/2012. Wellhead surrounded by chain-link fence and cement barriers. Well tag present, legible.

Site ID sign present, in compliance with Act 9 standards. Permit numbers posted. Emergency Response Plan present at access road entrance.

One brine tank on-site, sound. Brine tank, production equipment located in lined secondary metal containment unit. Accumulation, ice within containment unit.

Access road stable. Unable to adequately inspect well site due to snow-cover.

Department recommends Operator properly empty and dispose of accumulation in containment unit as per current regulations, continue to monitor and maintain BMPs, and remove any posted permit signs for any permits which have expired.

Extension for site restoration previously granted until April 8, 2015 (inspection record 2168010).

2320022 2014-11-04 No Violations Noted Marcellus.Well drilled and equipped for production.Drilling occurred 5/24/2012-7/8/2012.Wellhead surrounded by chain-link fence and cement barriers.WT present
2370272 2015-05-06 Violation(s) Noted Marcellus.At time of inspt
2370272 2015-05-06 Violation(s) Noted Marcellus.At time of inspt

For data sources see[3]