37-129-28656

Well Details

Well ID: 37-129-28656
Loading map...
County: Westmoreland
Municipality: South Huntingdon Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 149319
Farm/Lease Name: SLEITH UNIT 6H
First Permit Date: 2011-08-19
Last Permit Date: 2011-08-19
Spud Date: 2011-10-03
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 40.194855
Longitude: -79.743041

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 0.0 0.0 0.0 0.0 0.0 0.0
2014-1 113476.0 24.0 0.0 0.0 0.0 0.0
2014-2 728638.0 184.0 0.0 0.0 0.0 0.0
2015-02 83583.0 28.0 0.0 0.0 0.0 0.0
2015-01 94729.0 31.0 0.0 0.0 0.0 0.0
2015-03 88560.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-1 DRILLING FLUID WASTE 120.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 DRILLING FLUID WASTE 15.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 DRILL CUTTINGS 778.41 Tons LANDFILL 100419 ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL MCCLELLANDTOWN PA
2012-2 DRILLING FLUID WASTE 135.5 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 FRACING FLUID WASTE 3.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-2 FRACING FLUID WASTE 40.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2014-1 FLOWBACK FRACTURING SAND 30.54 Tons STORAGE PENDING DISPOSAL OR REUSE MID074259565 US ECOLOGY DETROIT MI
2014-1 FRACING FLUID WASTE 5.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 FRACING FLUID WASTE 2.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2014-2 FRACING FLUID WASTE 946.25 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 FRACING FLUID WASTE 4.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2014-2 PRODUCED FLUID 3.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2010399 2011-10-04 No Violations Noted SPUDDED
2013227 2011-10-21 No Violations Noted Routine inspection of site due to spud notification.

Pad was in final stages of construction. Four wells had been spudded. Drill pit was installed. Construction on impoundment was ongoing. Pad and access road were rocked and stable. BMPs in place. Toes of slope to be seeded asap. No violations noted.

2021169 2011-11-17 No Violations Noted SPUDDED, MOVING YOST RIG 6 ONTO PAD.
2026076 2011-12-12 No Violations Noted Site visit was part of routine inspection.

INspection was conducted with James Grayson (Safety Chevron). All equipment was on individual containment. Some areas where pipes laid on containmnet comprimised containment. No grease or oil stained the pad. Stands were being made to keep pipes from laying on walls of containment and causing them to collapse. Pit and impoundment were sound. No freeboard issues. Slopes of pad were not vegetated but had been hydroseeded. Other outlying areas of disturbed area had good vegetative cover. No violations noted at this time.

2026753 2011-11-29 No Violations Noted SPUDDED, MOVING YOST RIG 6 ONTO PAD.
2030686 2011-12-21 No Violations Noted HORIZONTAL MARCELLUS

SPUDDED, YOST RIG 6 ON PAD, DRILLING THE 9H. PIT & HOUSEKEEPING GOOD

2037556 2012-01-27 No Violations Noted
2042914 2012-02-07 No Violations Noted HORIZONTAL MARCELLUS

YOST RIG 6 ON PAD, DRILLING, DEPTH OF 6317'. PIT & HOUSEKEEPING GOOD


2048788 2012-02-27 No Violations Noted HORIZONTAL MARCELLUS

YOST RIG 6 ON PAD, DRILLING, DEPTH OF 6317'. PIT & HOUSEKEEPING GOOD


2048791 2012-03-01 No Violations Noted HORIZONTAL MARCELLUS

YOST RIG 6 ON PAD, DRILLING, DEPTH OF 6317'. PIT & HOUSEKEEPING GOOD INSPECTION CONDUCTED W/OGI D.ORRAHOOD

2052468 2012-03-21 No Violations Noted This was a followup to a drilling mud spill. No violations.
2052660 2012-03-13 No Violations Noted HORIZONTAL MARCELLUS

YOST RIG 6 ON PAD, DRILLING, DEPTH OF 6317'. PIT & HOUSEKEEPING GOOD

2061685 2012-04-09 No Violations Noted HORIZONTAL MARCELLUS

YOST RIG 6 ON PAD, DRILLING, DEPTH OF 6317'. PIT & HOUSEKEEPING GOOD

2068982 2012-05-15 No Violations Noted HORIZONTAL MARCELLUS

PATTERSON RIG ON PAD, DRILLING, DEPTH OF 13610. PIT & HOUSEKEEPING GOOD

2087940 2012-07-18 No Violations Noted 7/18/2012 Back filling drill pit, and not fraced yet.
2093975 2012-08-23 No Violations Noted 4 wells drilled. No frac yet. 2 lined impoundments.
2166030 2013-05-13 No Violations Noted At the time of inspection the well appeared to be drilled but not equipped for production. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2199772 2013-08-16 No Violations Noted At the time of inspection the well appeared to be drilled but not equipped for production. The Operator was in the process of reconfiguring the site for stimulation. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2216349 2013-10-24 No Violations Noted At the time of inspection the Operator appears to have finished stimulation of the well. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2228526 2013-11-11 No Violations Noted At the time of inspection the Operator appears to have finished stimulation of the well, however no production equipment on site. During the inspection the Operator was in the process of backfilling the pit closest to the well heads, when viewed from the access road. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2310346 2014-10-06 No Violations Noted 10/6/2014 Produced fluids tanks diked and GPU's
2369027 2015-05-05 No Violations Noted 5/5/2015 Produced fluids tanks diked and GPU's

For data sources see[3]