X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-26177

Well Details

Well ID: 37-059-26177
Loading map...
County: Greene
Municipality: Morris Township
Operator Name: EQT PRODUCTION CO
Well Pad ID: 145467
Farm/Lease Name: D IAMS 592112
First Permit Date: 2013-05-14
Last Permit Date: 2013-05-14
Spud Date: 2013-05-17
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.936475
Longitude: -80.294813

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 476330.0 118.0 0.0 0.0 0.0 0.0
2014-1 405936.0 181.0 0.0 0.0 0.0 0.0
2014-2 311839.0 184.0 0.0 0.0 0.0 0.0
2015-02 52266.0 28.0 0.0 0.0 0.0 0.0
2015-01 56887.0 31.0 0.0 0.0 0.0 0.0
2015-03 52230.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2013-2 FRACING FLUID WASTE 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-2 PRODUCED FLUID 83.0 Bbl INJECTION DISPOSAL WELL 34-083-24137 CHAPIN WELL # 7 (SWIW # 8) HOWARD OH
2013-2 PRODUCED FLUID 6.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 FLOWBACK FRACTURING SAND 20.42 Tons LANDFILL MID000724831 MICHIGAN DISPOSAL WASTE TREATMENT PLANT BELLEVILLE MI
2014-1 PRODUCED FLUID 3.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2189093 2013-07-24 No Violations Noted Patterson Rig 255 Drilling for E.Q.T. Rig had just finished running and cementing 5 1/2 " Production casing Lead Cement 180 bbls 830 sks 15.0ppg 1.21 Yield 5.25 gals/sak water Tail Cement 126 bbls 380 sks 15.6ppg 1.83 Yield 7.52 gals/sk water.

FCP-2700 psi @ 3.2bpm Bump Plug-3200 psi CIP-520 hrs 7-31-13 no cement returns.

For data sources see[3]

References