Well ID: 125-24033
Loading map...
County: Washington
Municipality: Independence Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Farm/Lease Name: JOSEPH POWERS 1H
First Permit Date: 2010-03-29
Last Permit Date: 2010-03-29
Spud Date: 2010-05-17
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: 4
Latitude: 40.277833
Longitude: -80.472222

Well Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1879912 2010-04-02 No Violations Noted Well spud, site and location good, closed loop system to be used
1881099 2010-04-13 No Violations Noted Nomak 241- Closed system, returns on cement, Site and location good condition, E & S in place,
1881113 2010-04-22 No Violations Noted Nomak 241- returns on cement, drilling ahead, frac pit under construction, site and location good
1888872 2010-05-19 No Violations Noted Nomak 241- running 16", closed loop system, site and location good
1888873 2010-05-22 No Violations Noted Nomak 241- returns on cement, drilling ahead, frac pit under construction, site and location good
1892979 2010-06-14 No Violations Noted Nomak 241- drilling ahead, site and location good . closed loop system.
1894201 2010-06-23 No Violations Noted
1895113 2010-06-22 No Violations Noted Nomak 241- TD @ 9918 tripping out, site and location good, closed loop
1907831 2010-07-07 No Violations Noted Nomak 241- TD @ 11087tripping out with core sample from 10818, site and location good
1907833 2010-07-19 No Violations Noted Nomak 241- TD @ 4630 building curve. site and location good
1933382 2010-09-23 No Violations Noted
1933383 2010-09-29 No Violations Noted
1939926 2010-09-23 No Violations Noted
1951871 2011-02-23 Pending
1952717 2011-02-24 No Violations Noted
1952726 2011-02-25 No Violations Noted
1957110 2011-02-23 No Violations Noted 19:08 hrs ¿ received call from Jim Russell on site Operations Manager for Chesapeake that fire was in progress in the frac tank area and three workers were injured.

19:10 hrs ¿ received 2nd call from Mike Arch Oil and Gas Inspector supervisor of fire on a Chesapeake Well site.

19:55 hrs ¿ Oil and Gas Inspector Don Rugh arrived at entrance to well site. Access road is approximately ¾ mile long. Multiple fire companies were at site, perimeter control was in place and emergency equipment was being controlled from this point. At this time I started calls to Mike Arch with updates every 15 minutes. 20:15 hrs - Inspector Rugh was on well pad where undetermined number of frac tanks was on fire. Fire and emergency personnel were hosing down fire and adjoining tanks with foam and cooling sand and test separators with water.

1957197 2011-02-25 No Violations Noted Marellus Horizontal

All three wells on location 125-24033, 125-24034, & 125-24035 were shut in at the time of investigation/inspection. My purpose for being on location was to gather information from a technical perspective for the department's bureau of investigations. I observed no violations during the course of my investigation, and had the cooperation of everyone on location. My remarks on the following page detail my investigation. The following documents that I collected that day are in the possession of the bureau of investigations: Site roster at the time of the fire, tank strap information, and a timeline of events from spud through flowback up to the time of the fire.


1979168 2011-02-23 Viol(s) Noted & Immediately Corrected Several DEP personnel repsonded to the after hours incident. No insp. rpts or NOVs sent. CO&A written by SWR OCC/ Central Office and sent by Central Office. 613053
1979168 2011-02-23 Viol(s) Noted & Immediately Corrected Several DEP personnel repsonded to the after hours incident. No insp. rpts or NOVs sent. CO&A written by SWR OCC/ Central Office and sent by Central Office. 613054
1979168 2011-02-23 Viol(s) Noted & Immediately Corrected Several DEP personnel repsonded to the after hours incident. No insp. rpts or NOVs sent. CO&A written by SWR OCC/ Central Office and sent by Central Office. 613055
1979168 2011-02-23 Viol(s) Noted & Immediately Corrected Several DEP personnel repsonded to the after hours incident. No insp. rpts or NOVs sent. CO&A written by SWR OCC/ Central Office and sent by Central Office. 613056
2096911 2012-08-31 No Violations Noted

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-3 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 PRODUCED FLUID 7.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119 EUREKA RESOURCES (WILLIAMSPORT WATER TREATMENT) WILLIAMSPORT PA
2012-2 PRODUCED FLUID 90.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2011-1 FRACING FLUID WASTE 90.0 Bbl INJECTION DISPOSAL WELL UIC2D0610317 GRER A-1 SALTWATER DISPOSAL MORGANTOWN WV
2011-1 FRACING FLUID WASTE 2657.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING PA
2011-2 FRACING FLUID WASTE 330.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE OF BRINE TO FRAC A WELL
2012-1 PRODUCED FLUID 129.67 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING