Well ID: 129-28478 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.503697,"lon":-79.560325,"icon":""}]} |
County: Westmoreland | |
Municipality: Washington Township | |
Operator Name: CNX GAS CO LLC | |
Farm/Lease Name: AIKENS 5E | |
First Permit Date: 2010-12-13 | |
Last Permit Date: 2011-07-29 | |
Spud Date: 2011-03-12 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 40.503697 | |
Longitude: -79.560325 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2014636 | 2011-10-28 | No Violations Noted | Drilling was ongoing on well 129-28474 Aikens 5A. All E&S controls had been installed as outlined in the E&S plan. The disturbed area had been temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. | |
1962072 | 2011-02-24 | No Violations Noted | Site preparation is underway. Operator is in the process of adding rock to the access road and well pad. Site ID plan and E&S plan located. There are no signs of erosion or sedimentation on the well site or access road. Drilling will begin next week. | |
1963795 | 2011-04-01 | No Violations Noted | Drilling 26" hole at 257' of proposed 280' at time of inspection. Pits lined and freeboard maintained. E/S controls in place and functioning as per available plan. | |
2076893 | 2012-06-15 | No Violations Noted | At the time of inspection the well was drilled and stimulated. The Operator indicated that the well was being equipped for production. The associated brine tank and secondary containment appeared to be in sound condition. No accelerated erosion and sedimentation observed in relation to the well pad area or access road. The E&S plan was onsite, the BMPs were properly implemented and maintained. The Department suggest the Operator continue to monitor the site on a weekly basis and after significant precipitation events to ensure E&S remains at a minimum. | |
2087335 | 2012-07-30 | No Violations Noted | Inspection of pit to evaluate pit condition prior to restoration extension. At the time of inspection the Department notes that the pit was lined and appears to be in sound condition. The pit had the required 2 feet of freeboard. The Department did not observe accelerated erosion or sedimentation in relation to the well pad or access road associated with the pit. The Department note the site has been temporary stabilized and all E&S controls appear to be in sound condition and properly installed and maintained. The Department suggests the Operator continue to monitor the pit and surrounding area weekly and after significant precipitation events to ensure erosion and sedimentation is kept at minimum. At this time the Department extends the restoration requirements of the Aikens Pit ESX 10-129-009 until the June 30 2013 | |
2101711 | 2012-09-20 | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus, brine tanks and heating units appear to be in sounds working condition. The Departments notes the Operator was actively working toward restoring the well pad area as outline in the restoration plan. At the time of inspection the Erosion and Sedimentation plan was onsite and appeared to be implemented. All BMPs were installed and functionally properly. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. | |
2128595 | 2013-01-04 | No Violations Noted | Well operating and properly identified.
Well equipped with production unit (separator, heater, meter). Discussed well annuli w/Operator rep S. Walker (78.83c. Intermediate and production casing; 78.88. Mechanical integrity of operating wells). 9 5/8” x 5 1/2” annulus closed and monitored (12-04-12 = 120 psig). Requested from Operator rep S. Walker 9 5/8” casing shoe test. 20” x 13 3/8” and 13 3/8” x 9 5/8” annuli cemented to surface and open to atmosphere (covered w/pea gravel). Well located on well pad containing (8) eight wells, (8) eight production units, and (8) eight produced fluids tanks. Well pad site reclaimed. |
|
2136493 | 2013-02-06 | No Violations Noted | no violations noted |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 499431.0 | 184.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 197448.0 | 65.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | FRACING FLUID WASTE | 11.02 | Bbl | LANDFILL | 79-00-04 | KIMBLE SANITARY LANDFILL | DOVER | OH |
2012-2 | PRODUCED FLUID | 514.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23584 | KOONTZ #1 DISPOSAL WELL | WARREN | OH |
2012-2 | PRODUCED FLUID | 497.44 | Bbl | INJECTION DISPOSAL WELL | 34-007-22038 | PAROBEK #2 (SWIW #12) | OH | |
2012-2 | FRACING FLUID WASTE | 11825.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2012-2 | FRACING FLUID WASTE | 16.72 | Bbl | LANDFILL | CID: 29084 | WASTE MANAGEMENT, INC - MAHONING LANDFILL, INC | NEW SPRINGFIELD | OH |
2011-1 | DRILLING FLUID WASTE | 200.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 | NORTH STAR BRINE DISPOSAL | YOUNGSTOWN | OH |
2011-1 | PRODUCED FLUID | 200.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 | NORTH STAR BRINE DISPOSAL | YOUNGSTOWN | OH |
2012-1 | PRODUCED FLUID | 37.5 | Bbl | INJECTION DISPOSAL WELL | 37-111-20006 | MORRIS H CRITCHFIELD F76 DISP WELL PAS2D912BSOM | FRIEDENS | PA |