If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-031-25654 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.2282134646,"lon":-82.163605183,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1985-11-10 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.2282134646 | |
Longitude: -82.163605183 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1032470422 | 2010-11-29 | Request from Berry Dugan to inspect wells before he purchases them. Well is equiped with pumping unit and motor, looks to be capable of production. | ||||
-257015649 | 2012-10-22 | On the day of my inspection Matheny Well Service pulled rods and tubing, then ran tubing back in well to 2965'. Cemenco set a 400' Clinton plug through the tubing. | ||||
-768429083 | 2012-10-24 | On the day of my inspection Matheny Well Service set a pre-cast cement plug at 1870' then shoveled 3 tons of clay into the well. They set a pre-cast cement plug at 825' and then shoveled 7 tons of clay into the well. | ||||
1297244514 | 2013-06-05 | On the day of my inspection I found that the former well site was plowed and planted in agricultural crops. The access road was also planted in crops. There were no leaks and there were no oilfield related materials or debris left at the location. This site passes final restoration. | ||||
1352148219 | 2012-11-05 | On the day of my inspection Matheny Well Service attempted to pull the 8" casing. They were unsuccessful at getting any of the casing free. The crew will return with ripping tools to make another attempt. | ||||
1352392142 | 2012-11-07 | On the day of my inspection Matheny Well Service pulled 360' of 8" casing from the well. They shoveled 7 tons of clay to fill the well to surface. Then they cut the casing off 30" below grade, capped the well with a steel plate and graded the soil out to the original contour. | ||||
1885232126 | 2007-09-24 | Motor removed from pumping unit , well is hooked up for production . | ||||
695219700 | 2012-10-23 | On the day of my inspection Matheny Well Service ripped the 4.5" casing at 1870' and pulled it from the well. | ||||
910565374 | 2009-01-28 | Well capable of production . |