X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-20617

Well Details

Well ID: 34-067-20617
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1983-05-25
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 40.1876694754
Longitude: -81.2989048253

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1206377942 2007-11-01 On site to witness plug back from 5900' to 5500' . Halliburton pumped a 25 sk plug through tubing to plug back the well. No violations at this time.
391650956 2010-06-03 On site to witness the plug back of the Oriskany to the Berea formation. Petroset pumped the plug 4271' to 4071' . The operator decided to finish the plug back to the Berea on Monday morning 06/07/2010. No violations at this time.
419092378 2010-06-07 On site to witness the plug back to the Berea. No violations at this time. Petroset pumped the plug to isolate the Berea.
753870493 2010-06-07 On site to witness the plug back to the Berea. Nobody on site when I arrived. I set on site and waited and nodody showed. I called Chris Kimble and he advised that the plug job was cancelled this morning but was scheduled for sometime around 1:00 in the afternoon. I advised him that I would return then to witness the plug back. No violations at this time.
919034457 2006-04-19 Inspection revealed no violations at this time . Common tank battery with permit number 0616 ; tank battery located on Crab Orchard Rd. The tank battery consists of one 210 bbl oil storage tank and the SPCC dike meets requirements .