X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-127-26489

Well Details

Well ID: 34-127-26489
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1984-11-19
Unconventional:
Horizontal:
Producing: No
Violations: 3
Latitude: 39.91574147
Longitude: -82.3648510025

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1010278922 2010-08-18 Follow-up inspection revealed well is still idle and incapable of producing, no action taken to bring well into compliance with 1509.
-1077285461 2008-12-09 An inspection of the well revealed no ID at the well head. Well is incapable of producing, 4 1/2" casing with a valve. Not production lines hooked to well head. Last production reported to Division 1991. 9-9-05(A)10
-1077285461 2008-12-09 An inspection of the well revealed no ID at the well head. Well is incapable of producing, 4 1/2" casing with a valve. Not production lines hooked to well head. Last production reported to Division 1991. NONE
-1128340817 2010-09-21 Follow-up on NOV, Non-Compliance, well is still idle and incapable of producing, no action has been taken to bring NOV into compliance.
-1393053766 2011-04-01 Restoration meets 1509.072(B) requirements.
-1786188477 2010-04-07 Follow-up on NOV, Non-Compliance, well still incapable of producing, no action taken to bring into compliance.
-1820988704 2009-03-12 Follow-up on NOV, Non-Compliance, will send the company a copy of the NOV and a letter.
-1864353097 2009-08-20 Follow-up on NOV, In-Compliance.
-866149671 2010-12-09 Follow-up, In-Compliance.
-915548356 2009-05-11 Follow-up on NOV, Non-Compliance,took photos of well.
1204421147 2009-04-13 Spoke with Tammy Snider manager for Mid-Con Petroleum, she thought well had been sold and requested more time to locate paper work or owner of well. Explained to her to send a written letter to the Jackson Office for a Delay in Plugging. To date no request letter has been sent.
1280755616 2010-07-14 Follow-up on Compliance Notice, well still idle and incapable of producing, no action taken to bring into compliance.
1569251084 2010-02-09 An inspection of the well revealed well is idle and incapable of producing. No equipment on well or lease. No flow lines hooked to wellhead. Last production reported 1991. Well needs to be placed into production or plugged. Plug or place well into production. Failure to comply may result in a forfeiture of BOND. NONE
1758448947 2010-11-15 Follow-up on NOV, In-Compliance.
1774453984 2009-05-18 Spoke with Adam Veraev( lawyer 740-345-9611), for company. He said well was transferred to landowner over 20 yrs ago and is trying to locate records and paper work on well.
1774814307 2009-04-30 Follow-up on NOV, Non-Compliance, no action taken to comply with NOV. Turn over to management for legal actions.
PL6686 Preliminary Restoration done information from Data Point