Spud Date: 2009-05-04
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 40.9341820154
Longitude: -81.6464664336

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1102502960 2009-05-15 Drilling pits have been solidified, closed and covered. No violaitons at this time.
-1118397230 2009-05-11 Whipstock has rigged down and is moving off the drilling location. The pits have been pumped down and completely fenced. No violations at this time.
-1150931721 2010-04-20 Preliminary restoration is approved.
-1244633085 2009-06-05 The well has been turned on. Permission was granted to install temporary fencing around the tank battery. Permanent fencing will be installed next week.
-1711261832 2009-05-07 Whipstock is drilling ahead on the main 7-7/8" hole with air. The pits are lined and fenced as required. No violations at this time.
-385057680 2009-06-11 The permanent chain link fence has been installed around both the tank battery and the wellhead and the identification sign is posted. The well has been turned on. Grading and seeding still need to occur before preliminary restoration is approved.
1351608764 2012-10-10 I inspected this producing facility while on location for a offset well presite investigation. The wellhead is comprised of a Plunger Lift System. The fencing is in working order and locked. The signage is legible and has all the proper required information. No violations were evidenced at the wellhead. The Tank battery consists of 2 - 140 Bbl. Stock tanks and a plastic 35 Bbl. Brine tank. Also present was the separator and measurement station. Tanks were equipped with Lightening Arrestor and Charcoal scrubber. All equipment is in seviceable condition and leak-free. I did not observe any violations at this location.
1617671567 2009-05-01 Whipstock is building the location and digging the drilling pits. The rig is scheduled to arrive on 5/2 and will spud the well on 5/4. The ID is posted.
221625269 2009-05-08 Whipstock is drilling ahead on the main hole with air. The drilling pits are lined, fenced and in good condition. No violations at this time.
928896845 2009-06-02 The tank battery has been built but has not been fenced. Dominion requested permission to install a temporary fence so that the well can be turned on. Permission was granted. The permanent fence should be installed within 7 to 10 days. The delay is due to the contractors schedule. The well should be turned on this week.