34-105-22868

Well Details

Well ID: 34-105-22868
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1984-03-17
Unconventional:
Horizontal:
Producing: No
Violations: 4
Latitude: 39.0196466803
Longitude: -81.9865954078

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1269i1047 2002-05-16 Follow-up on NOV, In-Compliance. Ted Dobbins also on inspection.
1269i409 2001-10-03 A Complaint of soil eroding from lease rd. onto parking lot and St. Rt. 124, after inspecting the lease rd. and well site several violations were found. There is soil entering the parking lot and St. Rt.124 which are both off the lease , the soil is coming from water breaks above the parking lot. Something needs to be done to stop the erosion from leaving the lease. A dike is needed around the tank battery , St.Rt.124 approx. 60'ft. from tanks and the Ohio River approx. 300'ft. from tanks, it is very likely oil and or brine could run into or onto these areas. Need full ID at the well head. Electric line needs hung up, in areas as needed to protect the health and will being of the public. 9-9-05(A)10
1269i409 2001-10-03 A Complaint of soil eroding from lease rd. onto parking lot and St. Rt. 124, after inspecting the lease rd. and well site several violations were found. There is soil entering the parking lot and St. Rt.124 which are both off the lease , the soil is coming from water breaks above the parking lot. Something needs to be done to stop the erosion from leaving the lease. A dike is needed around the tank battery , St.Rt.124 approx. 60'ft. from tanks and the Ohio River approx. 300'ft. from tanks, it is very likely oil and or brine could run into or onto these areas. Need full ID at the well head. Electric line needs hung up, in areas as needed to protect the health and will being of the public. 9-9-05(A)9
1407251077 2001-10-03 FOLLOW UP TO NOV # 1269i409 A Complaint of soil eroding from lease rd. onto parking lot and St. Rt. 124, after inspecting the lease rd. and well site several violations were found. There is soil entering the parking lot and St. Rt.124 which are both off the lease , the soil is co 9-9-05(A)10
1407251077 2001-10-03 FOLLOW UP TO NOV # 1269i409 A Complaint of soil eroding from lease rd. onto parking lot and St. Rt. 124, after inspecting the lease rd. and well site several violations were found. There is soil entering the parking lot and St. Rt.124 which are both off the lease , the soil is co 9-9-05(A)9
1727486020 2012-05-07 No violations.
384784598 2012-02-02 The pumping unit was running at the time of inspection. The stuffing box had a small leak.