If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23007 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.0473778177,"lon":-81.6401257255,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2007-08-01 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.0473778177 | |
Longitude: -81.6401257255 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1158939113 | 2007-08-09 | Interden Well Service was on site to complete the well. The pits will be used to flow back the well. | ||||
-1602528921 | 2007-08-21 | The pits were pumped down as requested on 8/20. There is sufficient capacity to contain any rainfall. | ||||
-1712927633 | 2008-06-10 | Preliminary restoration is approved. | ||||
1097858290 | 2007-08-08 | The drilling rig has moved off. The pits are fenced and lined and in good condition. The pits must be solidified and closed by August 22. | ||||
1188439678 | 2007-08-23 | Chemtech provided material to solidify the drilling pits. Schreiner plans to cover the pits on 8/24 to allow time for the pits to firm. | ||||
1200158419 | 2007-08-06 | The drilling rig is moving off. The drilling location and pits are fenced, lined and in good condition. No violations at this time. | ||||
283160484 | 2007-07-31 | The drilling pits have been dug and fenced. Drilling equipment is starting to arrive and the well should be spudded tomorrow. | ||||
349948413 | 2007-10-11 | The well has been completed, the tank battery set and the preliminary grading and seeding has been done. The well can be turned on as soon as the required fencing is placed around the tank battery. Preliminary restoration will be approved at that time. | ||||
667489470 | 2007-08-20 | The drilling pits are full after recent heavy rains. I contacted Schreiner representatives and told them to get the pits pumped down before they overflowed. The pits are scheduled to be solidified on 8/23. | ||||
950965065 | 2007-07-25 | Schreiner has started building the location in anticipation of the drilling rig arriving in the next few days. The affected area will be fenced off. |