34-169-22083

Well Details

Well ID: 34-169-22083
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1979-01-27
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 40.901289548
Longitude: -81.7560946735

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1330147034 2004-01-07 Grout top of hole with 3 yards to surface . Cement remained at surface after job was complete.The top of the clay was about 115 ft.---fill to surface with cement from that point.
-452037934 2003-12-23 Returned today and set Lime plug at 2380 with rock and stone and tree. 500 shovels
-468145739 2003-12-22 Set bottom plug and rip 4 1/2 casing . Set bottom plug with 300shovels clay.Then after rip set another 300 shovels.
145019507 2003-12-31 After having problem with bridge it did set at 790ft and Glen Davis filled back to 700ft on 12/302003 Today tag plug at 700ft and run in hole with 41/2 casing to 250ft and fill to surface with 5 tons of clay.
1496505067 2003-12-24 Found that the Operator is not going to plug today because he is waiting for fishing equipment and will not be ready until after Christmas.
217573287 2003-12-29 The operator is fishing for 7 inch casing and should be ready to pull all of it today.
854022905 2004-09-02 Meets requirements for restoration final.
897664378 2003-12-30 Check on rig and found that they are having trouble going in hole with the bridge and did get it set and it held at 790 ft. Fill to surface with clay.Plans are to let it settle over the weekend and top it off with grout to surface.