Well Details

Well ID: 34-111-24395
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-06-09
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 39.6417170456
Longitude: -80.9273522635

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-103380974 2013-08-12 Status check inspection update on the current drilling progress found the current drilling depth to be 10,272' with a projected total depth to be drilled of 11,823'. The company is currently off bottom and circulating the borehole due to a equipment malfunction on one of the mud pumps, the pump is due to be repaired by the end of the day and drilling is to resume.
-2025227400 2013-07-08 Status check inspection of the current well bore segment total drilling depth reached at 3075' using a 12.250 bit. The drilling company Alpha Hunter rig # 7 is pulling out of the hole with the drill string in preparation of running the 9.625 casing. A copy of the casing tally was received and reviewed.
-420846708 2014-03-05 Status check inspection found Producers Services set up stimulating stage 7 of 28 to be completed Grey wire line services perforated the well bore from 10,534' to 10,384' with 4 clusters of 18 shots with a completion frac plug set at 10,559'.
-573233421 2013-06-10 The said well was spudded on 06/09/13 by Express Energy services with 100' of 26 conductor set and cemented to surface on 06/09/13.
-752971448 2014-03-17 Status check inspection of the production casing post stimulation clean out process found a service rig on the hole currently drilling out between the 6th and 7th stimulation plug set. Recommendations were given to the company representative on site to ground all tanks being used in the process and consider using explosion proof fluid transfer portable pumps along with move the portable heaters back from the operations to a distance of not less than 50'.
-985416215 2013-07-11 Status check inspection and review of the 9.625 casing ran and cemented along with the review of the BOP test. Upon review of the BOP test it was noted that the pipe ram test was not done due to the proper the company not having the right pipe rams. The accumulator remotely controlled actuation control panel was not functioning and would only manually operate. The company man on site and myself agreed that a full BOP and accumulator retest was to be done before proceeding to drill again once the proper repairs were made.
1372777495 2013-07-02 Status check inspection of the drilling progress found the current drilling depth to be 352' using a 17.5 bit and drilling on air. The next casing to be set shall be 13.375 surface at 632'.
1372879708 2013-07-03 On this day I witnessed the running and setting of 634' of 13.375 surface casing. With Halliburton cement services cementing the casing back to surface. There were 2 500 barrel fresh water mix tanks to be potentially used for this cement job with one tank showing a low level of chlorides and not used on this job.
1373926503 2013-07-15 Inspection of the drilling progress found the current drilling depth to be 3770' using a 8.750 drill bit. With the company rigging up to start drilling on fluid. The drilling supervisor and myself discussed the recent cement tickets from Halliburton services and the fact that I am still waiting on a cement additive breakdown from those jobs.
1374527478 2013-07-22 On this day I witnessed the setting of the kick plug. The well bore was plugged back after being Open Hole logged. The well TD was 6226. One solid plug was set in 2 stages; with the 1st plug set from 6225' to 5663' then 13 stands were pulled and displaced with 79 barrels the next plug set from 5663' to 5098' and then 14 stands were pulled and displaced with 72 barrels; both plugs were displaced with oil based drill mud. Class H cement was used with a mud sweep ahead.
1374892816 2013-07-26 Status check inspection of the drilling progress found the current drilling depth to be 5129' with the driller time drilling and beginning to build the top section of the horizontal curve. The company is drilling on oil base drilling mud.
1375984214 2013-08-08 Status check inspection on the current drilling progress found the current drilling depth to be 9615' using a 8.750 drill bit, the drilling progress is currently delayed due to issues with the mud pump.
1376586374 2013-08-15 The total depth to be drilled has been reached at 11,829. With a Azimuth of 315.23 degrees.
1377012316 2013-08-20 On this day I received from the company man on site the records from the casing long string cement job. I also spoke with Tim Neil from Triad Hunter and we are working with Halliburton to get the incomplete cement ticket information so I may complete the casing cement reports.
1403209629 2014-03-05 Status check inspection found Producers Services set up stimulating stage 6 of 28 to be completed Grey wire line services perforated the well bore from 10,580' to 10,730' with 4 clusters of 18 shots with a completion frac plug set at 10,755'.
718447954 2013-06-27 Status check inspection found Alpha Hunter rig # 7 rigging up on the hole and should respud within the next 48 hours.
790407939 2013-07-19 Status check inspection found the drilling rig Alpha Hunter Rig # 7 tripping back in the hole after a bit change. The current drilling depth is 5859' with a 8.750 bit with a projected total depth of this current stage to be 6,200', the company will then plug back and start to drill and build their horizontal curve.