X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-163-20763

Well Details

Well ID: 34-163-20763
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1984-10-07
Unconventional:
Horizontal:
Producing: No
Violations: 2
Latitude: 39.3854543004
Longitude: -82.4791106747

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-74326066 2014-01-13 I received a request from Dan Goins, Southwest region supervisor. Dan requested I determine the status of this well. The well is located in Swan township, Vinton county. The well consists of casing with a well head. The last production was reported in 1986. There is a 4 swage on the well head, the valves were open .There is no legible identification The well was not leaking oil or gas. There is plastic piping along with a drip. All the production equipment is in disrepair. The well needs to have a legible identification. The well needs to be put into production within 30 days or plugged within 120 days. 9-9-05(A)10
-74326066 2014-01-13 I received a request from Dan Goins, Southwest region supervisor. Dan requested I determine the status of this well. The well is located in Swan township, Vinton county. The well consists of casing with a well head. The last production was reported in 1986. There is a 4 swage on the well head, the valves were open .There is no legible identification The well was not leaking oil or gas. There is plastic piping along with a drip. All the production equipment is in disrepair. The well needs to have a legible identification. The well needs to be put into production within 30 days or plugged within 120 days. NONE_