34-075-25592

Well Details

Well ID: 34-075-25592
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-04-09
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 40.5606461192
Longitude: -81.9232747048

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1122020913 2013-04-11 An intermediate string of 1008' of 8-5/8" casing was set and cemented this date. See the casing ticket for details.
-1122020913 2013-04-11 An intermediate string of 1008' of 8-5/8" casing was set and cemented this date. See the casing ticket for details.
-1218741798 2013-06-18 This is a producing pump jack well. There were no problems noted at the time of the inspection.
-65868442 2013-04-18 Drilling ahead at 3759' on fluid in the shale. There were no problems noted at the time of the inspection.
-667989257 2013-04-04 The pits are being dug.
-672425550 2013-04-10 Ran 7 joints of 11-3/4" surface casing to 314'. Petroset cemented with 350 sacks of class A cement. See the casing ticket for more details.
-672425550 2013-04-10 Ran 7 joints of 11-3/4" surface casing to 314'. Petroset cemented with 350 sacks of class A cement. See the casing ticket for more details.
-686985921 2013-07-18 The fence is being erected around the well and the tank battery as per the permit conditions. Preliminary Restoration is passed.
-939695872 2013-05-06 The second working pit, solidified on Thursday past, has been closed. The well head is fenced off.
1201063436 2013-06-11 Baker Hughes ran a cement bond log and found the top of the cement at 4904'. The top perforation is at 5435' so the 500' cement requirement is met. Baker Hughes perforated 52 shots from 5435-5540
1364553416 2013-03-28 Met with the drilling contractor, operator and the excavation contractor to discuss how the rig would be set up and where the drilling pits would be.
1365160837 2013-04-02 The location is being cut.
1365503218 2013-04-08 The drilling rig is being moved on and rigged up.
1365503218 2013-04-08 The drilling rig is being moved on and rigged up.
1365591639 2013-04-09 Mix mud and spud. Drilling ahead at 105' on fluid. 102' of drift was encountered.
1365591639 2013-04-09 Mix mud and spud. Drilling ahead at 105' on fluid. 102' of drift was encountered.
1366023640 2013-04-11 Drilling ahead at 776' on fluid. Part of the hillside slid into the outer pit tearing the liner. The pit was not in use at the time of the slide. It will be repaired prior to use.
1366023640 2013-04-11 Drilling ahead at 776' on fluid. Part of the hillside slid into the outer pit tearing the liner. The pit was not in use at the time of the slide. It will be repaired prior to use.
1366109690 2013-04-15 Drilling ahead at 2601' on fluid. No problems noted at the time of the inspection.
1366109690 2013-04-15 Drilling ahead at 2601' on fluid. No problems noted at the time of the inspection.
1366223919 2013-04-17 Drilling ahead at 3402' on fluid in the shale. Mixing potash.
1366223919 2013-04-17 Drilling ahead at 3402' on fluid in the shale. Mixing potash.
1366639696 2013-04-19 Drilling ahead at 4134' on fluid in the shale. There were no problems noted at the time of the inspection.
1366798322 2013-04-23 Just back to drilling after repairing the mud pump. Drilling ahead at 5433 in the Gull River where there was a 300 unit gas show.
1366890454 2013-04-24 Ran 5589' of 4-1/2" 10.5# casing set at 5597'. Universal cemented with 125 sacks of Rose Run Blend. See the casing ticket for the details.
1367577734 2013-04-30 The 1st working pit was solidified with 1 load of flyash.
1650037142 2013-04-22 Drilling ahead at 5208 in the Blackriver. No problems noted at the time of the inspeciton.
1691496555 2013-06-12 Producers acidized this well with 3000 gals of HCL. See the stimulation report for details.
1697871007 2013-04-24 Reached a total depth of 5595' (driller) 5598' (logger). Running 4-1/2" casing.
180444004 2013-04-12 The cement stayed up on the intermediate string. A long boomed trackhoe is on location removing the slipped earth from in and around the outer pit. A new reinforced liner is to be installed.
180444004 2013-04-12 The cement stayed up on the intermediate string. A long boomed trackhoe is on location removing the slipped earth from in and around the outer pit. A new reinforced liner is to be installed.
1877128110 2013-06-13 This is a producing pump jack well. The permanent fencing will be installed next week. There were no problems noted at the time of the inspection
244760626 2013-04-12 The BOP was tested to 520 psig for over 15 minutes with no pressure drop. The pressure was released and both relief lines are open.
244760626 2013-04-12 The BOP was tested to 520 psig for over 15 minutes with no pressure drop. The pressure was released and both relief lines are open.
660426209 2013-04-03 The location is being cut.
904247604 2013-04-16 Drilling ahead at 3076' on fluid. There were no problems noted at the time of the inspection.
904247604 2013-04-16 Drilling ahead at 3076' on fluid. There were no problems noted at the time of the inspection.