34-111-24452

Well Details

Well ID: 34-111-24452
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2014-02-23
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 39.8492279921
Longitude: -81.2867694863

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-45085325 2014-07-31 Status check inspection on the completion process found Renegade wireline services running in the hole with a plug and wireline gun with a completion plug to be set at 16,649' and 60 perforations to shot in 6-10 shot burst between 16,492' and 16,639' with Baker Hughes stimulation services on location standing by to stimulate the well.
-731040498 2014-04-01 04/01/14 the 2nd intermediate 12.250 well bore TD has been reached at 7442' with 9.625 casing ran and proper centralizer placement demonstrated with Allied cement services on location to cement the casing using a lead and tail cement mix.
1181657255 2014-05-30 Status check inspection on the drilling progress found the current drilling depth to be 14,856' in the horizontal well bore section using a 8.5 diameter drill assembly with a current directional azimuth of 156.32 degrees with 2600 units of 3rd party gas.
1393180991 2014-02-23 The said well is to be spudded on this day with 100' of 26 weld joint casing to be set inside a 32 borehole.
1393272934 2014-02-24 The said well was spudded on 02/23/2014 by Express Services top hole rig with 100' of 26 casing set and cemented on this day, the cement lost circulation during the initial job and fell back to 80' measured depth from surface, a coal seam was encountered at 80' while drilling the borehole. On 02/24/14 the casing was grouted through a 1 grout tube to surface by Express Energy's cement services with good cement to surface and a verified cement weight of 15.6#.
1393450645 2014-02-26 Status check inspection found the 24 surface borehole total drilling depth has been reached at 402', The company is currently running a borehole deviation survey and then will run the 18.625 casing.
1393492618 2014-02-27 On 02/27/2014- 402' of 18.625 surface casing was set and cemented to surface by Allied Cement services using Class A 2% calcium 1/4# flake cement with 100% open hole excess ran and the casing pressure tested to 500 psi over lift pressure upon the landing of the cement plug with 40 barrels of good cement returns to surface.
1393866857 2014-03-03 Status check inspection found Falcon rig # 20 currently drilling the 17.5" 1st intermediate bore hole at a depth of 2,117' with approximately 100' left to drill before the current stage is complete, A borehole directional survey will be run prior to running the production casing.
1395915380 2014-03-27 Status check inspection on the current drilling progress found Patterson drilling rig 316 rigged up and drilling the 2nd intermediate 12.250 well bore section with a current total depth drilled of 6,203' and the rig running back in with the drill string after pulling out of the hole to change over to a directional motor to build a 25 degree curve before landing this section at approximately 7,200'.
1396276630 2014-03-31 Status check inspection on the drilling process found Patterson 316 rig on location and the total drilling depth of the 2nd intermediate 12.250 borehole has been reached at a depth of 7,442', the company is conditioning the borehole and preparing to pull out of the hole with the drill string to begin to run the 9.625 2nd intermediate casing string.
1396551954 2014-04-03 Status check inspection on drilling process found Patterson rig 316 has finished running and cementing the 9.625 2nd intermediate casing and has skidded to the Keylor # 1-H 3411124449-0000.
1399909948 2014-05-12 Status check inspection on the drilling process found the current drilling depth to be 11,280' in the horizontal well bore section using a 8.5 diameter drill bit and 13.9# oil based drilling mud with a current directional azimuth of 149.07 degrees and 1611 units of 3rd party gas, the well bore true vertical depth is 8,411'.
1653398790 2014-03-05 Status check inspection found Falcon Drilling rig # 20 has completed the drilling process with the running and cementing of the 13.375 1st intermediate casing string, the rig is moving off location.