X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-155-23059

Well Details

Well ID: 34-155-23059
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1987-01-22
Unconventional:
Horizontal:
Producing: No
Violations: 1
Latitude: 41.2553378143
Longitude: -80.8698276074

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1317705021 2012-09-05 I completed a follow-up NOV inspection. My inspection found the ditch in the dike repaired and a 4" PVC drain in place with a cap on the outlet. There are new identification signs on the tank battery and well. Inspection passed.
1064944178 2003-07-17 Case# 03-011 , Jim Urwin, OH. EPA , Construction company uncovered a oil stained area along old flowline route . After inspection of uncovered oil stain area it was determined by Rick Simmers , myself and Jim Urwin the oil stained area could be left in place due to no potontial of harm to the enviroment . NO VILATIONS , RESOLVED .
1345637321 2012-08-22 On 8/22/2012, I conducted an urban production well inspection status check. My inspection found the well was equipped with a plunger lift unit (rabbit) that was in good condition. The tank battery contained one 100 barrel oil storage tank, one buried concrete brine storage tank, a separator, and the proper identification was posted. I noticed a drainage ditch through the southeast corner of the dike and called Strawn Oil Well Service at 330-537-3863, who takes care of Everflow's wells. I instructed them to dispatch the well tender to repair the dike immediately. I will perform a follow-up inspection by 8/27/2012. 9-9-02
PL3367 Preliminary Restoration done information from Data Point