34-075-22983

Well Details

Well ID: 34-075-22983
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1981-05-15
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 40.5036660733
Longitude: -81.9875282341

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1273952517 2011-07-08 Drilling out 3rd frac plug.
-1436074893 2011-06-06 Empting both pits, will solidify reserve pit in morning.
-1517662062 2011-07-26 FR passed
-1614394415 2011-07-11 All frac plugs drilled out. Tripping tubing out to remove mill and run back in with production assembly. Will then run rods and put to pumping.
-1750928352 2011-07-05 drilling out frac plugs with power swivel and tubing.
-1756552489 2013-02-08 This is a producing pump jack well. There were no problems noted at the time of the inpsection. The preliminary restoration has passed.
-1806391246 2011-07-15 Working pit closed. Well is pumping. Just changed over from Propane to its own gas.
-324571961 2014-01-23 This well was reentered and drilled horizonally. The well name is now Helen and the P # is now 2983 0010
-524215789 2011-05-23 Drilling ahead at 2398'. Angle is 2.5 degrees and direction is N71W
-54731362 2011-05-26 angle is 71 degrees. Drilling ahead on fluid. Unable to airiate because of too much restriction thru down hole motor.
-767553997 2011-07-20 Producing both oil and gas.
-768282056 2011-06-07 Solidified pit with 400 sx of cement.
-902053946 2011-07-14 Well is on line and pumping. Pit empty but for some oil that will be removed today.
118254385 2011-05-27 Angle is 76 degrees, tripping back into hole with PDC bit.
1239330150 2011-08-03 Buring flowline and electric line. Tanks set.
1309196474 2011-06-21 Fractured the first stage of a 5 stage treatment of the horizontal Clinton section. Unable to continue after a frac plug went off prematurely when pumping it into place. 1st Stage BDP 3320 psi, 1500 bbl of water w/1/2, 3/4, and 1# per gallon sand co
1309196474 2011-06-21 Fractured the first stage of a 5 stage treatment of the horizontal Clinton section. Unable to continue after a frac plug went off prematurely when pumping it into place. 1st Stage BDP 3320 psi, 1500 bbl of water w/1/2, 3/4, and 1# per gallon sand concentrations. Max Rate 40 BPM at 3200 PSI. After sand was on bottom
1338975948 2011-05-31 TD 4421 MD. Ran 4890' of 4-1/2" casing. Universal cemented with 200 sx cement. 1.29 yield 14.3 ppg. Plug down 2:45 am
1358096095 2011-07-07 Drilling on third frac plug.
1668613118 2011-06-27 Ran frac plug in on tubing and set at correct location. Did not encounter any problems placing or setting tool. Waiting to perforate today and then frac 2nd stage on Wednesday.
187456662 2011-07-12 Running pump and tapered rod string of 7/8", 5/8" and 1-1/2"(sinker bars) rods. Pump will be set at 72 degrees. A 160 pumping unit will be set later today.
1877523901 2011-07-06 Drilled out first plug. Tripping for a new bit.
547795792 2011-06-20 Horizontal completion. Perforating with a tubing conveyed perforation gun. Will frac' on 6/21/11.
556633552 2013-07-25 This is a producing pump jack well. There were no problems noted at the time of the inspection.
661452036 2011-06-23 Rerunning frac plug. Stopped suddenly at 3702' (same place as 1st time) and this time it threw slack and the line pulled out of the rope socket. Will fish out with tubing.