If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-22050 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.4926513223,"lon":-81.1395272452,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2008-08-19 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.4926513223 | |
Longitude: -81.1395272452 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1608370252 | 2008-08-20 | I witnessed the cementing of the 11 3/4" conductor pipe. There were no violations at this time. | ||||
-1972390633 | 2008-08-21 | I performed a rig inspection. The pit liners and the location were in good shape. There were no violations at this time. | ||||
-259710625 | 2008-08-20 | I performed a rig inspection. I GPS'd the well. The pit liners and the location were in good shape. There were no violations at this time. | ||||
1220017475 | 2008-08-29 | Pits have been solidified. Work pit is firm and in good order. Blow pit is firming up, south west corner is soft, the remainder of the pit is firm. Spoke Don Craiger they put a 2nd load in the blow pit, should firm up by the after noon. Site is soft, are has had a couple inches of rain the past few days. Lease road is stable to the pasture, and constructed out of durable material. Drill site is soft from the rain. | ||||
581641929 | 2014-04-24 | My inspection found the well to be equipped with a plunger lift unit. The annulus valve is closed. The well and tank battery are in good repair. The tank battery consists of a 100 BBL production tank, a 50 BBL poly brine tank, and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition. | ||||
919100718 | 2008-08-21 | I witnessed the cementing of the 8 5/8" casing. There were no violations at this time. | ||||
988080657 | 2011-11-21 | This well is equipped with a plunger lift system. The annulus is shut in and is plumbed into the flow line with a 1/4" copper line. Domestic production comes off of the 4.5" casing. The tank battery is equipped with one 110 barrel tank, one 1500 gallon poly brine tank and a mechincal separator. The dike is in good repair, equipment spacing is correct and proper identification is posted. The lease road is stable. |