X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-055-22050

Well Details

Well ID: 34-055-22050
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2008-08-19
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.4926513223
Longitude: -81.1395272452

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1608370252 2008-08-20 I witnessed the cementing of the 11 3/4" conductor pipe. There were no violations at this time.
-1972390633 2008-08-21 I performed a rig inspection. The pit liners and the location were in good shape. There were no violations at this time.
-259710625 2008-08-20 I performed a rig inspection. I GPS'd the well. The pit liners and the location were in good shape. There were no violations at this time.
1220017475 2008-08-29 Pits have been solidified. Work pit is firm and in good order. Blow pit is firming up, south west corner is soft, the remainder of the pit is firm. Spoke Don Craiger they put a 2nd load in the blow pit, should firm up by the after noon. Site is soft, are has had a couple inches of rain the past few days. Lease road is stable to the pasture, and constructed out of durable material. Drill site is soft from the rain.
581641929 2014-04-24 My inspection found the well to be equipped with a plunger lift unit. The annulus valve is closed. The well and tank battery are in good repair. The tank battery consists of a 100 BBL production tank, a 50 BBL poly brine tank, and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition.
919100718 2008-08-21 I witnessed the cementing of the 8 5/8" casing. There were no violations at this time.
988080657 2011-11-21 This well is equipped with a plunger lift system. The annulus is shut in and is plumbed into the flow line with a 1/4" copper line. Domestic production comes off of the 4.5" casing. The tank battery is equipped with one 110 barrel tank, one 1500 gallon poly brine tank and a mechincal separator. The dike is in good repair, equipment spacing is correct and proper identification is posted. The lease road is stable.