34-009-23761

Well Details

Well ID: 34-009-23761
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2007-03-19
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 39.2915771267
Longitude: -81.8341715632

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1067757569 2013-08-14 Inspected the unloading pad, containment dike, tanks, injection line, annulus pressure, and injection pressure. Containment dike is free of water. I reviewed brine hauling records on site. Good identification on 100 barrel steel tank.
-1403447964 2013-06-04 Unloading pad has been constructed out of concrete. Pad has a trench drain that flows into a sump with an open top. Sump has a submersible pump with a float switch. No connections have been made to the wellhead. Currently waiting on injection pump.
-146410421 2007-09-11 Preliminary restoration meets all requirements.
-1522976415 2013-04-23 Conversion to salt water injection well. Currently drilling out cement from Berea squeeze job. Drilled out to 1590' and tested the 4.5" casing. Pressured up to 750 psi three times. All attempts to pressurize the 4.5" casing resulted in the pressure dropping at a steady rate then stopping at 300 psi. Multiple attempts were made to circulate air out of the casing.
-1703559229 2014-09-04 Inspected the annulus pressure, injection pressure, unloading pad, containment dike, tanks, injection pump, injection line, and checked brine hauling logs on trucks unloading on the pad. Identification posted on 100 barrel steel tank.
-1755037850 2013-10-30 No sign of leaks at wellhead, unloading pad, or storage facility.
-188294022 2013-04-17 I accompanied John Scott on this well. They are going to squeeze the Berea today. The tubing was set at 1540. The squeeze job went good. They used 50 sacks of cement. Pressure test will be next week.
-2080770010 2013-05-13 Dike liner has sand layer (approximately 4" on top) then under tanks has an additional layer of limestone screening (approximately 4" thick and compacted). Tanks are currently being installed in the containment dike with a crane.
-2119190435 2013-05-07 Excavating for containment dike. 3 fiberglass tanks were delivered during inspection. Currently constructing gravel drive and parking area.
-2136699627 2013-08-30 Inspected the unloading pad, containment dike, tanks, injection line, annulus pressure, and injection pressure. Containment dike is free of water. There are two new 300 barrel fiberglass tanks on location at the edge of the parking area. The tanks are not connected and are not in use. Lee Atha has written for permission to add the tanks to the containment dike. Currently waiting on approval to install the tanks.
-221995641 2013-04-16 Conversion to salt water injection well. Timco wire line service and Berry Well Service Rig on site. Set a bridge plug at 1610' in side 4.5" casing. Loaded 4.5" casing with 20 barrels fresh water and set a cement retainer at 1540' inside 4.5" casing. Berea perforations 1581' to 1586'. Accompanied by Inspectors Josh Garland and Justin Smith.
-509496665 2013-05-22 Tanks are in dike. Site has been graded with seed and mulch applied. Vegetative growth has started to establish. Gravel access road and parking area are done. Access road has a lockable gate.
-55439440 2013-06-28 Witnessed initial injection operations. Injection pump was started and the injection tubing pressure went on vacuum. Inspected annulus pressure, injection pressure, containment dike, tanks, pump, and unloading pad. Dike was free of water. Good identification on 100 barrel steel tank.
-77889620 2014-04-23 No noted violations. Total barrels for today was read at 716 Bbl. Two more 100 Bbl fiberglass tanks have been installed since the last inspection.
1333984 2013-04-22 Conversion to salt water injection well. Ran tubing with bit to drill out cement retainer and cement inside the 4.5" casing. (Berea squeeze job) Currently drilling.
1344970538 2012-08-14 Pre site review with Jon Scott. The only body of water nearby is the Hocking River.
1345036860 2012-08-14 Site evaluation for a Salt Water Injection Well permit. Well # 3761 is located 158 feet West of Rt 144. Hocking River is 550 feet to East of Well # 3761. A 1/2 mile radius search for water wells resulted in one well 868 feet to South East at N39.290410 / W081.831463. Well Log Number 84685, Depth 70 feet.
1356266172 2013-04-17 Conversion to salt water injection well. Tested 4.5" casing prior to squeeze job, from cement retainer set at 1540' to surface. Filled 4.5" casing to surface with fresh water and pressured up to 750 psi. Wellhead slips were seen bubbling and a slight drop in pressure was observed. The pressure test prior to squeeze job was performed by Lee Atha to test the 4.5" casing. Formation Cementing pumped tubing capacity plus 1 barrel fresh water prior to pumping 50 sacks class A cement with 2 % Gel.
1366221174 2013-04-17 Witnessed squeeze job with Inspector Jon Scott. Retainer set at 1540, perforations in the Berea from 1581-1586 feet. 50 sacks class A with 2% gel squeezed into perforations to shut off zone.
1366981613 2013-04-24 Conversion to salt water injection well. Witnessed parmaco packer and 1566' of 2 7/8" steel tubing (lined with PVC) being installed in the 4 1/2" casing. Filled annulus with 13 barrels fresh water and 1 gallon inhibitor. Tested annulus at 650 psi for 15 minutes with a loss of 5 psi. Test passed.
1371069592 2013-06-12 Witnessed the line test from the pump to the well head. Line was able to hold pressure for test period with no loss.
1371842453 2013-06-21 Well is connected to injection line. All valves are closed. Currently waiting on approval order to start injecting. Inspected the injection pressure, annulus pressure, containment dike, tanks, injection pump, and unloading pad.
1373477408 2013-07-09 Inspected annulus pressure, injection pressure, containment dike, tanks, pump, and unloading pad. Dike was free of water. Good identification on 100 barrel steel tank. Collected brine sample from injection line valve located between the filter housing and the well. Brine sample was shipped to ODNR Lab.
1378748611 2013-09-04 Inspected the unloading pad, containment dike, tanks, injection line, annulus pressure, and injection pressure. Containment dike is free of water. Witnessed two new 300 barrel fiberglass tanks being installed in the containment dike. Witnessed a Select Truck UIC # 359 unload on the unloading pad. A brine sample was collected and sent to the Lab.
1389640856 2014-01-13 No noted violations.
1390409752 2014-01-13 Inspected the containment dike, tanks, unloading pad, inspected the injection well and checked the injection pressure and annulus pressure. Reviewed brine hauling log on a Mountain States Environmental Truck UIC # 25 462. 100 barrels of produced water from Trans Energy, Freeland well pad, Hundred WV. API # 47-049-02225 2H. Accompanied by Andrew Adgate UIC Geologist.
1391702843 2014-02-06 Inspected unloading pad, containment dike, tanks, injection pressure, annulus pressure, injection pump, and injection line.
1400624420 2014-05-20 Inspected the injection pressure, annulus pressure, unloading pad, injection pump, containment dike, tanks and injection line.
1405688373 2014-07-17 Inspected unloading pad, containment dike, tanks, injection pump, injection line, annulus pressure, and injection pressure. Checked brine hauling logs and witnessed trucks unloading on the pad. Collected a brine sample from a Summit Environmental Services Truck. The Truck had 110 barrels of brine from Antero Resources, Yolando pad, Ritchie County, WV. API 4708510018. Brine sample was taken to the ODNR Lab in Cambridge.
1410196653 2014-09-08 Producers Service Corp did an acid treatment this morning. Check brine hauling logs on trucks (10 trucks) at facility. Collected a brine sample from a Summit Truck UIC #25-534. 110 barrels brine from Antero Resources Myers Lease, API # 47-033-05624. Inspected the unloading pad, containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. Gave verbal instructions to a Hydro haul Brine truck UIC # 25-570 License # BA526040 that they need a company phone number on the truck and that their UIC number needs to be at least 4 inches in height (a UIC number was on the truck it was 2" ). I gave the truck driver a copy of the brine hauler requirements.
1439574483 2013-05-09 Containment dike liner has been installed. A 6 inch layer of sand is being placed on top of the liner. Limestone screening is being placed on top of the sand layer with in the dike.
144363858 2013-11-21 Accompanied Inspector Josh Garland on inspection. Site was in good order. No pollution or contamination was observed.
1508622613 2007-03-22 Witnessed installation and cementing of the surface casing.
1526179423 2013-10-29 Inspected unloading pad, containment dike, tanks, injection pump, injection line, annulus pressure, and injection pressure. Identification is posted on 100 barrel tank near the unloading pad. Collected a brine sample from a Clearwater Operating Truck UIC # 25-567. Origin of the brine was the Facemeyer # 1. API 34-105-23575. 65 barrels. Containment dike is free of water. Brine sample was taken to the Jackson office for shipment to the Lab.
164031182 2013-07-15 No violations. Tanks, dike, and unloading pad are in good condition.
190851837 2013-04-16 I accompanied John Scott on this well. They are converting it to a salt water injection well. They set the bridge plug at 1610, then set the cement retainer at 1540.
1996088538 2007-04-06 Well site conditions were acceptable.
2079690719 2013-12-05 No noted violations.
2105803445 2014-05-27 Surfcae facility inspection. No noted violations.
32523471 2013-11-21 No violations at facility.
474774430 2013-05-07 Placing tanks today.
54311955 2007-03-20 Drilling at 382 feet. All conditions were acceptable.
651804887 2014-07-09 No noted violations at the facility. Total Bbl for 7/9/14 was 2090.