If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-127-27388 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.8442261925,"lon":-82.4538302964,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2009-09-28 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 1 | |
Latitude: 39.8442261925 | |
Longitude: -82.4538302964 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1465902940 | 2014-02-11 | I was onsite to witness the plugging of this well. I was accompanied by LJ the new floating inspector. The rig crew finished plugging the well today. They had Cemenco onsite to set the Lime plug, the bottom of the surface plug and the surface plug. There were no problems during the plugging. The cement stayed at the surface. I gave the rig crew the ok to rig down. | ||||
-1784766615 | 2014-08-04 | Final restoration meets 1509.072. | ||||
-839417518 | 2014-05-27 | I returned to this well to do the final restoration. The well does not meet the standards. There is still a 210 barrel tank on location with a latter. I contacted Clint Poling and he said they would try to get the tank off of location this week. | ||||
1124284833 | 2014-04-17 | I stopped by this well to see if the material has been removed from the well site yet. The production tank is still on location. I contacted Clint Poling and he said they would be getting it out of there within the next week. | ||||
1327277068 | 2012-04-25 | Plug back of well from Rose Run to Clinton formation. | ||||
1391789280 | 2014-02-07 | Mark Hines has moved in on this well to plug it. They are pulling out the tubing today then running it back to set the bottom plug on Monday. | ||||
1392044712 | 2014-02-10 | Bottom hole plug set. I covered this job for inspectore Justin Smith. MH well service is ripping 4.5 casing the remainder of the day. Justin will finish the plug job. | ||||
1460810404 | 2010-08-06 | Restoration meets 1509.072(A) requirements. | ||||
1860773056 | 2014-01-29 | During my inspection on this well I was unable to find any identification for this well. The ID will need to be put at the wellhead or at the tank pad. It has to have the following- Owner, lease name, well number, permit number, township, county, and emergency contact number. | 9-9-05(A)10 | |||
1866968277 | 2014-02-11 | The compliance notice I sent out on this well will not be necessary. The owner had a permit to plug the well. The well is now plugged. | ||||
379813774 | 2009-10-02 | Witnessed surface job. Circulation and returns were observed. The cement stayed at surface. |