INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-1048222520
|
2014-08-19
|
|
Final restoration inspection. The well has been plugged and the site is planted in crops. The production equipment has been removed. The final restoration is passed.
|
|
|
|
-1633759868
|
2014-04-10
|
|
I spoke on the phone with John Murphy of Murphy Oil Co. at 10:35 a.m., and we discussed any plans to plug or produce this well. John explained that Murphy Oil Co. has the plugging permit for this well and they have contracted Knox Energy to perform the plugging operations. John stated that they plan on having the well plugged as soon as the ground firms up and before the field it sits in is planted for the year.
|
|
|
|
-1756188272
|
2014-05-07
|
|
Knox Energy and a Cemenco on site. Bottom plug set using the bullhead method. After the plug was landed, the well began to unload the salt water used to follow the plug. I spoke with Bill Mitten and told Bill I would require the bottom plug to be tagged. The cement was tagged at 2955'.
|
|
|
|
-2009581042
|
2012-05-24
|
|
Performed inspection for the purpose of checking to make sure that the annular disposal was not in use. Annulus had fittings in it and a 1 inch black plastic line that ran to the top of a 50 barrel tank. This was used as a vent. The 1 inch line was cracked. I contacted Mr John Murphy at 3:56 pm and he stated that he would have his pumper put a valve on it with a plug.
|
|
|
|
-790121628
|
2013-06-07
|
|
This is a follow up inspection on the NOV of this well. Nothing has changed at this well. Road access to this well has been blocked by the new landowners according to John Murphy. This and other circumstances have forced him to obtain a permit to plug this well. In light of this I will not pursue further action. I will continue to monitor the progress of this situation to ensure his company has applied for the permit.
|
|
|
|
1166461318
|
2006-12-13
|
|
Checked AD for Columbus, AD not in use.
|
|
|
|
1272343147
|
2007-04-26
|
|
No violations were noted.
|
|
|
|
1356370186
|
2012-10-24
|
|
There is no (0) well production reported in RBDMS for the last two reporting periods 2010 and 2011. According to 1509:.062A; Nonproduction; Well shall be plugged or produced. At the intermediate casing head, the packer between this casing and production tubing is leaking small amounts of gas. 1501:9-9-05(A)1/1509:20 Well insufficiently equipped to prevent escape of oil and gas. Need to stop the release of gas to the environment.
|
|
9-9-05(A)1
|
|
1356370186
|
2012-10-24
|
|
There is no (0) well production reported in RBDMS for the last two reporting periods 2010 and 2011. According to 1509:.062A; Nonproduction; Well shall be plugged or produced. At the intermediate casing head, the packer between this casing and production tubing is leaking small amounts of gas. 1501:9-9-05(A)1/1509:20 Well insufficiently equipped to prevent escape of oil and gas. Need to stop the release of gas to the environment.
|
|
NONE
|
|
1356370186
|
2012-10-24
|
|
There is no (0) well production reported in RBDMS for the last two reporting periods 2010 and 2011. According to 1509:.062A; Nonproduction; Well shall be plugged or produced. At the intermediate casing head, the packer between this casing and production tubing is leaking small amounts of gas. 1501:9-9-05(A)1/1509:20 Well insufficiently equipped to prevent escape of oil and gas. Need to stop the release of gas to the environment.
|
|
NONE_
|
|
1356370186
|
2012-10-24
|
|
There is no (0) well production reported in RBDMS for the last two reporting periods 2010 and 2011. According to 1509:.062A; Nonproduction; Well shall be plugged or produced. At the intermediate casing head, the packer between this casing and production tubing is leaking small amounts of gas. 1501:9-9-05(A)1/1509:20 Well insufficiently equipped to prevent escape of oil and gas. Need to stop the release of gas to the environment.
|
|
NONEC
|
|
1399400491
|
2014-05-06
|
|
Knox Energy is on site tripping out tubing. Separator and tanks have been removed. No fluid was found in the well bore. Bottom plug will be set on 05/07/2014 by the bull head method.
|
|
|
|
2031130193
|
2014-05-08
|
|
Knox Energy on site plugging this rose run well. Formation cementing on site at 1431 hours. 71 barrel of oil was circulated out of the well, Knox Energy geologist believes it is coming from the Queenston formation. They have stopped plugging the well at 1455'. There is 300' of cement covering the Clinton formation. I told John Murphy he would need to apply for a plug back permit.
|
|
|
|
2062070540
|
2014-05-19
|
|
Knox Energy on site to finish plugging this well. Bottom plug and Clinton sandstone plug set on 05/07/14. Lime plug, bottom of surface and surface plug set. Well was cut off and identification plate was placed on the well pipe.
|
|
|
|
435941094
|
2012-10-24
|
|
Followed up on Andy Thomas' inspection on May 24, 2012. The operator put a ball valve on the vent line as Andy requested. Well is presently shut in. At the intermediate casing head, the packer between this casing and production tubing is leaking small amounts of gas.
|
|
|
|
iDIAN003863
|