If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354242306002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.018255,"lon":-113.330014,"icon":""}]} |
Location: 00/06-23-035-24W4/2 | |
Location Alias: 00/06-23-35-24 W4M | |
Location Alias 2: 00/06-23-035-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 24 | |
Section: 23 | |
County/Municipality: Red Deer County | |
Well Name: PIONEER CANADA HUXLEY 6-23-35-24 | |
Operator Name: TAQA North Ltd. | |
License Number: 0115110 | |
License Date: 1985-06-05 | |
License Status: RecCertified | |
Spud Date: 1985-07-23 | |
Final Drill Date: 1985-07-30 | |
Well Total Depth: 1735.00 m | |
Surface Hole Latitude: 52.018255 | |
Surface Hole Longitude: -113.330014 |
Date | Event |
---|---|
1985-06-05 | Obtained License |
1985-07-23 | Surface Casing Operation Performed |
1985-07-30 | Finished Drilling |
1985-07-31 | Drill Stem Test Performed |
1985-07-31 | Well Log Performed |
1985-08-01 | Drill Stem Test Performed |
1985-08-03 | Production Casing Operation Performed |
1985-08-03 | Rig Released |
1985-08-21 | Well Log Performed |
1985-08-24 | Perforation Treatment Performed - Jet Perforation |
1985-08-24 | Perforation Treatment Performed - Remedial Casing |
1985-08-27 | Well Log Performed |
1985-08-28 | Perforation Treatment Performed - Jet Perforation |
1985-08-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-09-04 | Perforation Treatment Performed - Jet Perforation |
1985-09-04 | Well Log Performed |
1985-09-06 | Perforation Treatment Performed - Cement Squeeze |
1985-09-06 | Perforation Treatment Performed - Jet Perforation |
1985-09-06 | Plug Back Performed |
1985-09-06 | Well Log Performed |
1985-09-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-09-10 | Perforation Treatment Performed - Fractured |
1987-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-09-29 | Plug Back Performed |
1987-09-29 | Well Log Performed |
1987-09-30 | Perforation Treatment Performed - Jet Perforation |
1987-09-30 | Well Mode changed to Drilled and Cased |
1987-10-07 | Perforation Treatment Performed - Jet Perforation |
1992-06-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-06-24 | Plug Back Performed |
1992-06-24 | Well Abandoned |
1992-06-24 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-08-24 | Perforation | 1000.00 | 1001.00 | 7 |
1985-09-10 | Fracture | 1692.00 | 1698.00 | 0 |
1987-09-29 | Packing Device Capped w/Cement | 1672.00 | 1680.00 | 0 |
1987-09-30 | Perforation | 1644.40 | 1645.50 | 13 |
1987-10-07 | Perforation | 856.00 | 857.40 | 13 |
1987-10-07 | Perforation | 859.00 | 863.00 | 13 |
1992-06-24 | Packing Device Capped w/Cement | 1617.00 | 1625.00 | 0 |
1992-06-24 | Packing Device Capped w/Cement | 846.00 | 854.00 | 0 |
1985-08-24 | Remedial Casing Cementing | 1000.00 | 1001.00 | 0 |
1985-08-28 | Perforation | 1720.00 | 1725.00 | 13 |
1985-08-29 | Acid Treatment | 1720.00 | 1725.00 | 0 |
1985-09-04 | Perforation | 1717.30 | 1718.60 | 13 |
1985-09-06 | Cement Squeeze | 1717.30 | 1725.00 | 0 |
1985-09-06 | Perforation | 1692.00 | 1693.50 | 13 |
1985-09-06 | Perforation | 1696.00 | 1698.00 | 13 |
1985-09-08 | Acid Treatment | 1692.00 | 1698.00 | 0 |
For data sources see[4]