X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354240916000

Well Details

Well ID: 0354240916000
Loading map...
Location: 00/16-09-035-24W4/0
Location Alias: 00/16-09-35-24 W4M
Location Alias 2: 00/16-09-035-24 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 24
Section: 09
County/Municipality: Red Deer County
Well Name: G&W ET AL HUXLEY 16-9-35-24
Operator Name: Pine Cliff Energy Ltd.
License Number: 0134375
License Date: 1988-06-16
License Status: Issued
Spud Date: 1988-06-17
Final Drill Date: 1988-06-26
Well Total Depth: 1765.00 m
Surface Hole Latitude: 51.994109
Surface Hole Longitude: -113.367473

For data sources see[1][2]

Well History

Date Event
1988-06-16 Obtained License
1988-06-18 Surface Casing Operation Performed
1988-06-26 Finished Drilling
1988-06-27 Well Log Performed
1988-06-28 Drill Stem Test Performed
1988-06-30 Production Casing Operation Performed
1988-06-30 Rig Released
1988-07-14 Perforation Treatment Performed - Jet Perforation
1988-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-07-15 Plug Back Performed
1988-07-16 Perforation Treatment Performed - Jet Perforation
1988-09-23 Perforation Treatment Performed - Fractured
1988-10-05 Well Mode changed to Drilled and Cased
1989-02-11 Well Began Production
1989-02-11 Well Fluid changed to Gas
1989-02-11 Well Mode changed to Flowing
1997-09-01 Well Fluid changed to Gas
1997-09-01 Well Mode changed to Suspended
1999-03-17 Well Fluid changed to Gas
1999-03-17 Well Mode changed to Flowing
2004-11-25 Perforation Treatment Performed - Jet Perforation
2004-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-26 Plug Back Performed
2004-11-26 Well Log Performed
2004-11-28 Perforation Treatment Performed - Fractured
2016-02-01 Well Fluid changed to Gas
2016-02-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-07-14 Perforation 1711.00 1712.00 13
1988-07-14 Perforation 1714.00 1715.00 13
1988-07-15 Packing Device Capped w/Cement 1698.50 1708.00 0
1988-07-16 Perforation 1682.50 1684.50 13
1988-07-16 Perforation 1685.00 1688.50 13
1988-09-23 Fracture 1682.50 1688.50 0
2004-11-25 Perforation 1642.50 1645.50 17
2004-11-26 Packing Device Capped w/Cement 1662.00 1670.00 0
2004-11-28 Fracture 1642.50 1645.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 126 0.0 0.0 0.0
1989 5568 0.0 0.0 0.0
1990 6968 0.0 0.0 0.0
1991 6621 0.0 0.0 0.0
1992 8286 0.0 0.0 0.0
1993 7435 0.0 0.0 0.0
1994 81 0.0 0.0 0.0
1995 173 0.0 0.0 0.0
1999 6600 0.0 0.0 0.0
2000 7746 0.0 0.0 0.0
2001 8752 0.0 0.0 0.0
2002 8758 0.0 0.0 0.0
2003 8704 0.0 0.0 0.0
2004 7421 0.0 0.0 0.0
2005 744 0.0 0.0 0.0
2013 720 0.0 0.0 0.0

For data sources see[5]

References